Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />9. COMMENTS <br />FRP=Fibergalss Reinforced Plastic. PS=Piping Sump. Unknown FGC=Unknown Fiberglass <br />Construction. Total Cont.=Total Containment. <br />Note: Product Piping Run #1 Regular 87, is from Piping Sump #1 Regular 87 to UDC 1 &2, #1 side. <br />Product Piping Run #3 Regular 87, is from UDC 1 &2, #2 side, to UDC 3&4, #3 side. <br />Product Piping Run #2 Diesel, is from Piping Sump #2 Diesel, to UDC 1&2, #1 side. Product Piping <br />Run #4 is from UDC 1&2, #2 side, to UDC #3&4, #3 side. <br />All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 5 of 5 <br />