My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1111
>
2200 - Hazardous Waste Program
>
PR0514132
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:21 AM
Creation date
6/23/2020 6:24:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514132
PE
2220
FACILITY_ID
FA0010027
FACILITY_NAME
DEPENDABLE PRECISION MFG INC
STREET_NUMBER
1111
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04705009
CURRENT_STATUS
01
SITE_LOCATION
1111 S STOCKTON ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0514132_1111 S STOCKTON_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />SITE HEALTH AND SAFETY PLAN <br />PART I <br />PART II <br />GENERAL SITE INFORMATION <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Site Name: Dependable Precision Manufacturing <br />l . Chemicals Hazards <br />Address: 1111 S. Stockton St <br />❑ Carcinogens: <br />Contact Person: Cliff McBride Phone No: 209-369-1055_ <br />❑ Corrosives: <br />Sweeps Number: <br />❑ Dusts: <br />Proposed Date of investigation/inspection: 5/12/04 <br />❑ Explosives: <br />E i~lammables: <br />2. Description and brief narrative of inspection activity: <br />❑ Inorganic Gases: <br />❑ New UST installation.. ❑ UAR Investigation. <br />❑ Metals: <br />❑ Tank Closure in Place.. ❑ Tank/Pipe Repair. <br />❑ Oxidizers: <br />❑ Tank/Pipe Removal. ❑ Re -excavation. <br />❑ PCB's: <br />❑ Installation of Borings / Monitoring Wells. <br />_[34fazardous waste inspec n ❑ Sampling <br />PART III <br />3 <br />Specific Site Information: <br />Tank No.: Tank Capacity: <br />Tank Content: Tank Age: <br />Other: <br />4. Type of Operation: /fir �'_'kj�` <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES af�b <br />Documented Groundwater contamination: ❑ YES 0-90 <br />Background and description of any previous investigation or incidence: <br />6. Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />El Heat or Cold Stress:_ °F (high ambient temp.) <br />.� Noise Sources: 1 -Cl -« <br />❑ Oxygen Deficiency: <br />❑ Excavation: (falls, trips, slipping, cave-ins): <br />❑ Handling and Transfer of a Hazardous Substance: (fire, explosions, <br />etc..): <br />❑ Confined space entry: (explosions): <br />❑ Heavy equipment (physical injury & trauma resulting from moving <br />equipment): <br />❑ Other, specify <br />7. Anticipated Biological Hazards: <br />❑ Snakes ❑ Insects ❑ Rodents ❑ Poisonous Plants <br />❑ Other/Unknown (specify): <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.) <br />EH 23081 (02/19/03) <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />I . Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes (Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B <br />❑ Hard Hat. <br />JDgafety Glasses/goggles. <br />Steel toed/shank shoes or boots. <br />❑ Flame retardant coveralls. <br />❑ Hearing protection. <br />❑ Tyvek. <br />■ �l <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: <br />❑ Safety vest. <br />❑ Two-way communication. <br />PART IV - PLAN APPROVAL <br />Plan Prepared by: John Jackson Date: 5/12/04 <br />Plan Approved by: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.