My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3151
>
2200 - Hazardous Waste Program
>
PR0514193
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:06 PM
Creation date
6/23/2020 6:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0514193
PE
2220
FACILITY_ID
FA0010138
FACILITY_NAME
DELTA AUTO WRECKERS
STREET_NUMBER
3151
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17910012
CURRENT_STATUS
02
SITE_LOCATION
3151 S HWY 99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0514193_3151 S HWY 99_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />SITE HEALTH AND SAFETY PLAN <br />PART <br />GENERAL SITE INFORMATION <br />1. Site Name: Delta Auto Wreckers <br />Address: 3151 S HWY Stockton CA 95215 <br />Contact Person: Steve Schmidke Phone No: 209.948.6879 <br />Sweeps Number: <br />Proposed Date of investigation/inspection: 12/4/03 <br />2. Description and brief narrative of inspection activity: <br />❑ New UST installation.. <br />❑ UAR Investigation. <br />❑ Tank Closure in Place.. <br />❑ Tank/Pipe Repair. <br />❑ Tank/Pipe Removal. <br />❑ Re -excavation. <br />❑ Installation of Borings / Monitoring <br />Wells. <br />® Hazardous waste inspection <br />❑ Sampling <br />3. <br />Specific Site Information: <br />Tank No.: Tank Capacity: <br />Tank Content: Tank Age: _ <br />Other: <br />4. Type of Operation: Rack Manufacture <br />5. Release History: <br />Evidence of leaks / soil contamination: ❑ YES ❑ NO <br />Documented Groundwater contamination: ❑ YES ❑ NO <br />Background and description of any previous investigation or incidence: <br />6. <br />Potential Health and Safety <br />Physical Concerns: (check all that apply & describe) <br />❑ Heat or Cold Stress: °F (high ambient temp.) <br />® Noise Sources: <br />❑ Oxygen Deficiency: <br />® Excavation: (falls, trips, slipping, cave-ins): <br />❑ Handling and Transfer of a Hazardous Substance: (fire, explosions, <br />etc..): <br />❑ Confined space entry: (explosions): <br />® Heavy equipment (physical injury & trauma resulting from moving <br />eauinment): <br />❑ Other, specify <br />7. Anticipated Biological Hazards: <br />❑ Snakes ❑ Insects ❑ Rodents ❑ Poisonous Plants <br />❑ Other/Unknown (specify): <br />8. Narrative (provide all information which could impact Health and Safety, <br />e.g., power lines, integrity of dikes, terrain, etc.) <br />EH 23081 (02/19/03) <br />PART II <br />EVALUATION OF POTENTIAL HAZARDS <br />1. Chemicals Hazards <br />® Carcinogens: <br />® Corrosives: <br />❑ Dusts: <br />® Explosives: <br />❑ Flammables: <br />❑ Inorganic Gases: <br />® Metals: <br />❑ Oxidizers: <br />❑ PCB's: <br />PART III <br />REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br />1. Monitoring Equipment (note: Monitoring instruments must be used for all <br />operations unless appropriate rationale or restrictions are provided) <br />❑ Combustible Gas/Oxygen Meter. <br />❑ Detector Tubes (Specify). <br />❑ Photo ionization Detector. <br />❑ Organic Vapor Analyzer. <br />❑ Other, specify. <br />If monitoring instruments are not used, rationale or activity / area restrictions: <br />2. Personal Protective Equipment <br />Level of Protection: ❑ A ❑ B ❑ C ❑ D <br />® Hard Hat. <br />® Safety Glasses/goggles. <br />® Steel toed/shank shoes or boots. <br />❑ Flame retardant coveralls. <br />❑ Hearing protection. <br />❑ Tyvek. <br />❑ Respirator: ❑ APR ❑ SCBA <br />A/P cartridge: <br />❑ Safety vest. <br />❑ Two-way communication. <br />PART IV - PLAN APPROVAL <br />1 <br />Plan Prepared by: ' f � V� Date: December 2, 2003 <br />4 Plan Approved by: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.