Laserfiche WebLink
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> 0 0 <br /> orders, etc.) UHFCHANNELS/VERBAL/PA SYSTEM <br /> EVACUATION ASSEMBLY AREA(S) (9) SEE ATTACHED EVACUATION ROUTE MAP <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) BUSINESS SERVICE OFFICE <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors(e.g. residential, commercial, open space)are located within 1/8th mile of our facility. <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH AGRICULTURAL & RAILROAD EAST AGRICULTURAL <br /> SOUTH AGRICULTURAL WEST INDUSTRIAL <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> SPILL CONTROL LEADER (12) JASON OSBORN <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br /> JASON OSBORN DISTRICT MAINTENANCE DEPARTMENT <br /> AUTHORIZED SPILL CONTROL STRATEGIES(14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br /> needed equipment are shown on the facility map.At a minimum our business must isolate the area of the spill and <br /> make notifications. <br /> SPILLS OF LIQUID MATERIALS <br /> ❑ Plug and Patch Container ❑ Build Retention Dike <br /> 1170 Remove Sources of Ignition Position Container so as to Stop Leak <br /> ❑ Reduce Pressure in Container/System Isolate Area and Make Notifications <br /> ❑ Neutralize Spilled Material Secure System Valves and Closures <br /> F Shutdown System Involved Apply Absorbent Material to Spill Area <br /> ❑ N/A <br /> RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> ❑ Reduce Pressure in Container/System Position Container so as to Stop Leak <br /> Suppress Vapors with Water Place Spilled Material into Drum or Bag <br /> Isolate Area and Make Notifications Isolate Area and Make Notifications <br /> http://sjoesdata.org/oes hmmp/section tables/HMMP_ps_Review.lasso?-Database=transaction+Plan+File... 4/9/2010 <br />