My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />Monitoring System Certification - Pao <br />a of 3 <br />Site Address: 2494 E. Fremont St. @ Filbert St. Date of Testing/Servicing: 5/25/04 <br />F. In - Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly'? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLD's are not installed. <br />Complete the followinj4 checklist: <br />® Yes <br />❑ No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak reate: ® 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />® Yes <br />❑ No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />® N/A <br />® Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />® Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected'? <br />® Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />® Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.