My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL TEST RESULTS FOR THE PRODUCT AND VAPOR OVERFILL CONTAINMENT <br />Sliell <br />5/25/04 <br />2494 E. Fremont Street — Stockton, CA. 95205 <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer <br />El Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />El Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Measuring tape <br />Equipment Resolution:Example <br />- 1/8 " increments <br />,. <br />� ., <br />...., � `� ?_ 1 , � <br />.% r <br />Spill Box # 87 <br />Spill Box # 91 <br />Spill Box # Waste Oil Spill Box # <br />15-F <br />5-V <br />15-F <br />5-V <br />5 <br />Bucket Capacity in gallons: <br />Bucket Depth: <br />13" <br />10" <br />13" <br />10" <br />10" <br />Wait time between filling with <br />water and starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />5 min <br />"fest Start Time: <br />9:00 am <br />9:00 am <br />9:00 am <br />9:00 am <br />9:00 am <br />Initial Reading (R1): <br />10'/4" <br />10 5/8" <br />3 5/8" <br />5 3/8" <br />Test End Time: <br />11:00 am <br />11:00 am <br />11:00 am <br />11:00 am <br />11:00 am <br />Final Reading (RF): <br />10'/4" <br />10 5/8" <br />5 3/8" <br />Test Duration: <br />2 hour <br />2 hour <br />2 hour <br />2 hour <br />2 hour <br />Change in Reading (RF-Rj): <br />None <br />Fail <br />None <br />Fail <br />None <br />Pass/Fail Threshold or Criteria: <br />ZERO LOSS <br />ZERO LOSS <br />ZERO LOSS <br />Test Result: <br />El Passj <br />❑x Fail <br />❑O Pass <br />I O Fail <br />❑x Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Found regular vapor and premium vapor buckets had bad cracks around inside. <br />Buckets need to be replaced. <br />Tested By: Service Station Systems, Inc. Technician: Rick D. <br />Contractor License: 485184 <br />
The URL can be used to link to this page
Your browser does not support the video tag.