Laserfiche WebLink
38196NC-Stockton,CA 0 Summary <br />NFW Ct7NSTRIICTION FLD - JOB LOG SUMMARY <br />• <br />TYPE OF TEST (Pretest, Final, Leak locate, Retest) = <br />Final <br />Probe Install? (Yes/No) <br />NO <br />Job Number: <br />38196NC <br />Crew: Steve Anderson <br />53" <br />Client: <br />CGRS <br />Contact: <br />Brian Green <br />Site Name: <br />Fremont Shell <br />Phone: <br />970-420-6822 <br />Site Address: <br />2494 E. Fremont <br />Site Contact: <br />Jim Day <br />City, State: <br />jStockton, CA 95205 <br />Site Phone: <br />916-826-3085 <br />Crew: <br />Site Lead: Nick Hill <br />Pass <br />Pass <br />Pass Pass I N/A <br />I A1W <br />Crew: Steve Anderson <br />53" <br />91 <br />Pass <br />Pass <br />Pass <br />Pass I Pass I N/A <br />Total i a e Hrs <br />Initial <br />50" <br />Start Date: <br />06/15/05 Start Time: 8:30am <br />End Time: 7:00 m <br />10.5 10.5 <br />UDCs -# <br />Day Two Date: <br />06/16/05 Start Time: 7:30am <br />End Time: 3:30pm <br />8 8 <br />HSP / PROBEs - # <br />HSP <br />Day Three Date: <br />06/17/05 Start Time: <br />End Time: <br />Day Four Date: <br />06/18/05 Start Time: <br />End Time: <br />Day Five Date: <br />06/19/05 Start Time: <br />End Time: <br />MAKE NOTES IF YOU HAVE ANY UNBILLABLE HOURS <br />Total Billable Hours <br />18.5 <br />Total Detected Leaks <br />5 <br />Brine <br />Brine <br />LINES <br />TANK <br />Tracer/He <br />Start <br />End <br />TEST Complete <br />Primary I Secondary Vent <br />TS I FVRS <br />I TI <br />Tank / Line <br />I Start (in) <br />End (in) <br />87 <br />Pass <br />Pass <br />Pass <br />Pass Pass I N/A <br />I A1W <br />53" <br />53" <br />91 <br />Pass <br />Pass <br />Pass <br />Pass I Pass I N/A <br />I ANV <br />50" <br />50" <br />VR / Vent <br />Pass <br />Pass <br />UDCs -# <br />4 Pass <br />HSP / PROBEs - # <br />HSP <br />1 <br />6 # Samples <br />29 <br />COMMENTS: (Leaks, unbillable hours, site spacific info) <br />Leaks located in 91ts at the ATG riser to manway and on an elbow on the VR line, in the 87ts at the 4in. Plug on the VR and vent T connection <br />and on the product line where the pipe enters the boot entry, in udc 1 under the 87 shear valve where it connects to a 45 elbow. <br />Form Completed By: Nick Hill Date: 6/16/2005 State Lic # 05-1701 <br />Hours Approved By: Signature: Date: <br />QA Review By: Date: Time: <br />Page 1 <br />