Laserfiche WebLink
11 <br />XERXES" ink Installation Check& <br />Fiberglass Underground Storage Tanks <br />Single -Wall (SWT), Double -Wall (DWT), Multicompartment (MCT) and OiUWater Separators (OWS) <br />Complete this checklist, and keep it with copies of any written authorizations for variations and/or deviations received from Xerxes. <br />Date of Installation Tank Size and Capacity <br />• Tank Type SWT DWT MONITORING -FLUID DRY MCT OWS (Circle those that apply.) <br />• Site Owner <br />• Site Address <br />STREET <br />• Installing Contractor <br />CONTRACTOR NAME STREET <br />• On -Site Supervisor <br />CITY <br />CITY <br />UL Number <br />STATE ZIP <br />STATE ZIP <br />1. PREINSTALLATION Verified by: <br />A. Visual Inspection: No evidence of damage (holes, cracks, gouges) in tank. (Document any damage found.) .... .......................... <br />B. Monitoring -Fluid Tanks: 1. Check and record monitoring -fluid level in reservoir. ..o......................................................................... <br />2. Check for monitoring fluid inside and outside of tank ....... 014'�.!..................................................:.... <br />C. Physical Test: Preinstallation air/soap test completed in accordance with installation instructions....................................................... - <br />D. Backfill Material: (Indicate which type.)ea gravel crushed stone as specified by XERXES......................................... <br />2. Other (Requires specific approval by XERXES — describe.) ......................... I....... A <br />E. Excavation: Hole dimensions are correct per installation instructions for appropriate conditions........................................................ cf <br />F. Internal Diameter Measurement: Theintemaldiameterofthetankismeasuretlanddocumented(Ini6allntema DiameterinSECTlON4below)....11,. <br />G. Geotextile Utilized: (Indicate one.) 1. Yes 20......................................................................................................................... <br />H. Hole Condition: (Indicate one.) 1..,D�ry hole (A'l/ater is not anticipated to reach tank — area is not subject to flooding.) ................ <br />2. Wet hole (Excavation may trap water— area is subject to flooding.) ...................................... <br />I. Traffic Loads: (Indicate one.) 1. Traffic loads anticipated........`.................................................................................. <br />................................................................................ .... <br />J. Anchoring: Performed in accordance with installation instructions. 1. Deadmen 2. Full ....... /U. f�.................... <br />K. Fittings and Other Metal Components: Coated to protect against corrosion ...............,. (.1.. fs a .................................................... <br />DURING INSTALLATION <br />A. Backfill -material bed is level and is a minimum of 12 inches deep, over native soil or slab, before setting tank ............. y�J <br />B. Tank Spacing: Tanks are spaced correctly from each other and from excavation according to instructions .......................... /� 7 $ - <br />C. Visual Inspection: No evidence of damage is found after setting in hole.................................................................. D............... <br />D. Hold-down Straps: Positioned and secured according to installation instructions. (See SECTION 6.4. of Installation Manual.).... <br />E. Backfill Compacted: Material has been tamped and/or compacted to fill all voids around tank........................................................... <br />F. Tank is properly ballasted during backfilling: (wet -hole installation only) .................................................. :......................... <br />..�...,..r..... <br />G. Tank(s) are buried at proper depth to conform to appropriate conditions: (wet, dry, traffic or no traffic) ......................:y ..... ....... <br />'OSTINSTALLATION EL <br />A. Physical Test: Air/soap test is completed according to installation instructions.................................................................................... <br />B. Internal Diameter Measurement: The internal diameter ofthe tank is measured and documented (Final Internal Diameter in SECTION 4 below).... <br />C. Monitoring -Fluid Tanks: 1. Check and record monitoring -fluid level in the reservoir (inches) ......................................... <br />2. Check for monitoring fluid inside tank...................................................................................................... <br />D. Containment Sump Water Test: Fill the containment sump assembly with water to check for leaks .................................................. <br />E. Installation Manual: Deliver Installation Manual and Operatinq Guidelines to owner.......................................................................... <br />All tanks must be measured to determine vertical deflection. Follow deflection -measurement instructions (SECTION 14) in the Installation Manual. <br />An initial internal -diameter measurement is taken and recorded as a point of reference. Subsequent internal -diameter measurements show tank deflection <br />and can be compared to the table below. Take each measurement from the same fitting using the same procedure. <br />End Center End <br />External Tank <br />Diameter <br />4 <br />6 <br />8 <br />10 <br />12 <br />(Feet) <br />Allowable <br />Deflection <br />112 <br />314 <br />1-114 <br />1-112 <br />1-3/4 <br />(Inches) <br />Internal -Diameter Measurements <br />Initial Internal Diameter (before backfilling) 174 ° <br />Final Internal Diameter (after backfilling) <br />Initial Internal Diameter minus , ! , s 6 „ I.j <br />Final Internal Diameter = Deflection <br />Mark the location where internal -diameter <br />Verified hv- measurements were taken. <br />27 <br />