My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION: <br />a. In the event contamination is observed, confirmed or suspected as a <br />result of a leaking UST system it is the responsibility of the owner or <br />operator to submit a work plan to EHD Site Mitigation Unit prior to <br />initiating any assessment or remediation activities. <br />b. To minimize delays, a Corrective Action Plan may be submitted <br />concurrent with tank closure or installation plans. Address one copy of <br />the Corrective Action Plan to the Site Mitigation Unit for review. For <br />further assistance contact the Site Mitigation Unit at (209) 468-3450. <br />B. PLAN REVIEW AND OPERATING PERMIT FEES <br />1. New facility plan review fee of $744.00 (8 hour minimum per facility), $500.00 <br />facility fee (includes one tank), $125.00 per tank after the first tank, plus $10.00 <br />state surcharge fee per tank is due at time of plan submittal plus $17.50 per site state <br />surcharge. <br />2. New installation of an additional tank at an existing facility is $744.00 plan review <br />fee (8 hour minimum per facility) plus $125.00 per new tank after first tank, and <br />$10.00 per new tank state surcharge fee. <br />3. It should be noted that a $744.00 plan review check fee required for each submittal <br />allows for up to eight (8) hours of staff review and/or inspection time. Additional <br />time spent on plan review, meetings, inspections, phone or office consultations will <br />be billed to the applicant at a rate of $93.00 per hour. <br />4. The maximum review time for UST installation plans is 40 working days. A <br />preliminary review will be conducted by the EHD within 20 working days of <br />submittal date to identify any gross plan deficiencies. <br />5. If gross deficiencies are identified, the plans will be returned with a checklist <br />identifying plan deficiencies. <br />6. To expedite the review of installation plans, time and a half per hour overtime fee <br />may be submitted to have review completed within 10 working days of submittal <br />date if staff is available to perform the review. <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.