My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2494
>
2300 - Underground Storage Tank Program
>
PR0231104
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 2:08:21 PM
Creation date
6/23/2020 6:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231104
PE
2351
FACILITY_ID
FA0003863
FACILITY_NAME
SOHAL #3
STREET_NUMBER
2494
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15328008
CURRENT_STATUS
01
SITE_LOCATION
2494 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\2494\PR0231104\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LJ <br />OPW EVR Thread -on or OPW/POMECO; <br />certified for installation on OPW Phase I EVR systems. All fill <br />feature enhanced 1DK-2100-EVR vapor tight drain valves thal <br />a maximum vapor leak rate of 0.17CFH at 2.0 inches H2O.' <br />feature, a permanent plug installed in the drain ports as per <br />uirements. <br />tion Valves are 'certified ;for <br />Ys,re designed to provide <br />S,`EPA requirements, <br />ilefloat pt and a <br />threaded lower tube erection And excee'the EVrq r�ierat for.tttax�mEtrri°vapor leak <br />rate of 0.17CFH at 2.0 des H2O. The 61 SMR si row f the OPW <br />EVR spill container witkAhe patent pending 61JSK Jack Scre-'� ►1tt ation allows <br />liquid in the spill conf�erto be drained directly into the drd`tube, thereby )Su ing the drain <br />valve from the tank ulle, eliminating a notorious leak point in previous systems. <br />Wftt The OPW/POMECO 6111-1400 Tank Bottom Protector is EVR certified` <br />Wrl'allation at the bottom of the overfill prevention valve drop tube to help prevent the <br />v rground storage tank from sustaining damage from erosion or tank gauging sticks. <br />The OPW 53VML Ball Float, 233ailed <br />61T Fill Drop Tube configuration can be installed as an alternative�150 , <br />Overfill application.; The installation of the Ball Float/Drop Tube*;tem is <br />identical to the 61 SO Overfill valve on Phase 1 Vapor Recovery Systems. <br />Q ,W R Rot�taW---Swivel<Ada tors 4r��cgrtifjd <br />for installation on the fill and vapor ports on �r"r Swwel Adaptors' <br />from loosening on the spill container risers � OM a'EVR"req't cement to <br />maintain a minimum 360 -degree rotation with artt3irque nQt ko.excee 108 inch <br />pounds (9 foot pounds). The enhanced po et OPW 61VSA-EVR vapor swivel <br />adaptor provides, a vapor fight seal when closed, per equirements. <br />'adaiptor Tool - An OPW 61 SA TOOL Adaptor installation tool is required to ensure proper <br />installation of QPW Rotatable Swivel Adaptors, spill containers and threaded riser adaptors, per <br />EVR requirements. The 61 SA -TOOL includes provisions for the use of a torque wrench to facilitate <br />accurate installation and testing. <br />per EVR requirements. <br />ation on <br />feature <br />)le-tigght <br />nodels. <br />e� Miser Adaptor (Face Seal Adaptor) - An OPW FSA -400 Threaded Riser Face Seal <br />Adaptor is required to provide a flat, true sealing surface on threaded pipes where a gasket seal <br />exists per EVR requirements. The FSA -400 is installed on the fill pipe riser below the spill <br />, - W -n container to provide a true sealing surface for the drop tube flange on the 61 SO-40OC-EVR <br />overfill prevention valves. The FSA -400 is also required on tank gauging risers, though is optional <br />on vapor risers and rotatable adaptors, <br />Pressure Vacuum Vent - The OPW 623V Pressure Vacuum Vent is certified for installation on the <br />OPW Phase 1 EVR System. The 623V`s are installed on top of the vent pipes for underground <br />fuel storage tanks. The vent cap and internal wire screen are designed to protect the tank vent <br />lines against intrusion and blockage from water, debris or insects. A normally closed poppet in <br />the valve opens at a predetermined pressur&or vacuum setting to allow the tank to vent. The <br />623V exceeds the EVR requirement of a maximum vapor leak rate of 0.17CFH of 2.0 inches H2O. <br />• <br />"'�rcrs�t <br />9393 Princeton -Glendale Road •Cincinnati, Ohio 45011 • Tel: (800) 422-2525 • Fax: (800)`421-3297 • www.opw-fc.com <br />2003, OPW Fueling Components P1 EVR-8/03-5M <br />
The URL can be used to link to this page
Your browser does not support the video tag.