Laserfiche WebLink
O <br /> O <br /> 00 <br /> d <br /> z <br /> U <br /> vi .. <br /> U a <br /> 10 1/2" <br /> PRESSURE VACUUM VENT 1" FIRE RATED, 0 <br /> CAPS STAINLESS STEEL q Q' U <br /> FLEXIBLE CONNECTOR <br /> UNISTRUT <br /> 2" GALVANIZED <br /> UNION & NIPPLES 1" GALVANIZED VENT PIPING MIN, SLOPE VENTS SUPPORT b O ti U <br /> PER FOOT, 100FT, MAX LENGTH. MAX. DISTANCE BRACKET <br /> CFC 2010 §2206.7.9.2.2 LOCATION WITH a> <br /> WITHOUT PIPE SUPPORT NOT TO EXCEED 10', <br /> VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED AT OR 2" GALVANIZED SAME ELEV. AS U W U <br /> ABOVE GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT TEE TOP OF P V VALVE <br /> LESS THAN 50 FEET (15240mm) FROM FUEL-TRANSFER <br /> AREAS AND NOT LESS THAN 18 INCHES (457.2mm) ABOVE I FLOAT CHECK VALVE AIR BREATHER ASSEMBLY P/N 9948 <br /> TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS, P/N 9468G 12' MINIMUM ABOVE GRADE <br /> VAPOR-PROCESSING UNITS SHALL BE LOCATED NOT LESS OVERFILL PROTECTION <br /> THAN 10 FEET (3048mm) FROM THE NEAREST BUILDING OR 2"X1" REDUCER BUSHING <br /> PROPERTY LINE OF A PROPERTY WHICH CAN BE BUILT UPON. 1" BLADDER VAPOR INLET ASSN. <br /> EXCEPTION: WHERE THE REQUIRED DISTANCES TO SIPHON <br /> BUILDINGS, PROPERTY LINES OR FUEL-TRANSFER AREAS 2" GALVANIZED ELBOW y <br /> CANNOT BE OBTAINED, MEANS SHALL BE PROVIDED TO — --- — TEE W/ PLUG <br /> PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE <br /> MEANS INCLUDE: <br /> 1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT SIPHON TUBE ADAPTER STAMP <br /> LEASE 18 INCHES (457.2mm) ABOVE THE EQUIPMENT, <br /> CONSTRUCTED OF FIRE-RESISTANT OR NON-COMBUSTIBLE <br /> MATERIALS OR - <br /> 2. FIRE PROTECTION USING AN APPROVED WATER-SPRAY <br /> SYSTEM. HEALY CLEAN AIR SEPARATOR <br /> CONTRACTOR SHALL CONFIRM AND LABEL <br /> VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED A ALL VENT STACKS WITH CORRECT AIR <br /> MINIMUM OF 20 FEET (6096mm) FROM DISPENSING DEVICES. PRODUCT VENT TIE IN BALL VALVE TO AVOID <br /> PROCESSING EQUIPMENT SHALL BE PROTECTED AGAINST PRODUCT CONTAMINATION AND rr r l SIPHON TUBE <br /> LOCKED OPEN <br /> PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE IMPROPER PROCESSOR TIE-IN. i <br /> ENCLOSURES OR FENCING. WHEN APPROVED PROTECTIVE PROVIDE CONFIRMATION ON PIPE AND OR I , <br /> ENCLOSURES ARE USED, APPROVED MEANS SHALL BE TANK CHECKLIST (LABEL MAKER OK). IN NORMAL I !! �� 400 GALLON BLADDER, <br /> PROVIDED TO VENTILATE THE VOLUME WITHIN THE ENCLOSURE OPERATION <br /> TO PREVENT POCKETING OF FLAMMABLE VAPORS. ' ��1 ' VAPOR <br /> HEALY CLEAN AIR SEPARATOR <br /> IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE o i .j (36" O.D. X 93" E.G.) <br /> VAPOR-PROCESSING UNIT FROM A FUEL-TRANSFER AREA, ae. <br /> THE CHIEF IS AUTHORIZED TO REQUIRE ADDITIONAL r m BALL VALVE tl) <br /> SEPARATION BY DISTANCE AND HEIGHT. o LOCKED CLOSED I �i— <br /> CFC 2007 §2206.7.9.2.3 INSTALLATION a OR 3 704 PLACARD Q._ <br /> VAPOR-PROCESSING UNITS SHALL BE SECURELY MOUNTED ON <br /> CONCRETE, MASONRY OR STRUCTURAL STEEL SUPPORTS ON oIN NORMAL <br /> CONCRETE OR OTHER NON-COMBUSTIBLE FOUNDATIONS. o �� OPERATION 5 y <br /> ¢ _ 5 >C v <br /> a a Y/) uCT <br /> v <br /> iw <br /> 2" SCH. 40 GALV. STEEL a. <br /> O1 VENT RISER PAINT TO BALL VALVE "NO SMOKINVFWAABLE VAPORS" Q A <br /> z MATCH SITE CONDITIONS LOCKED CLOSED SIGN WITH 3 HIGH LETTERING ON i/ r/ <br /> m E o OR CONTRASTING BACKGROUND FRONT VIEWOOF BOLLARD V <br /> o w O FASTEN VENT RISER TO FRAME W/ NOT SHOWN IN THIS VIEW _ <br /> 2" BRONZE U-BOLT, 3/8"0 HOLE IN NORMAL SIPHON TUBE <br /> FOR CLARITY. <br /> b W/ LOCK WASHER HEX NUT. TEST OPERATION <br /> 9 <br /> _ LV IJ EACH RISER FOR ELECTRICAL 400 GALLON BLADDER, o ¢ <br /> 2" SCH, 40 GALVANIZED STEEL RISER. CONTINUITY TO VENT RACK (TYP.) <br /> IZ STRAIGHT PIPE BOLLARDS, <br /> PAINT PER SPECS (TYP.) 2" TEE WITH 1/4" TEST LOCATION BASED ON SITE H <br /> - PORT FITTING AND 1/4' " CONDITIONS r <br /> 2" TEE WITH 1/4" TEST PORT PLUG (TYP.) c9i <br /> FITTING AND 1/4" PLUG (TYP.) BOLTED GROUND CONNECTION TO I i v1 O <br /> VENT RACK. JUMPER Y4 AWG BARE G <br /> STRANDED CU FROM,STAND ALONE Ba;"-1 SENSOR i i , ! ; BOLTED GROUND CONNECTION <br /> MOUNTING RACK TO HEALY TANK BASE. ¢ <br /> EXPLOSION PROOF J-BOX EXPLOSION PROOF J-BOX <br /> / / 8" 2,500 PSI <br /> I MOUNTED TO POST MOUNTED TO POST FAIR <br /> I I � I( VAPOR � CONCRETE TANK <br /> BOLTED GROUND CONNECTION TO SEAL OFFS SLAB. <br /> 2-IN-1 SENSOR VENT RACK. JUMPER q4 AWG BARE Tn "`� <br /> BOX STRANDED CU FROM STAND ALONE \\� p4 AWG BARE STRANDED CU <br /> MOUNTING RACK INSTALL (1) 1" CONDUIT PLUG \` GROUND WIRE. ROUTE TO <br /> MANOMETER SEAL OFF FUTURE LTANKEDI GNOSTIC (FOR ( SEE TANK FIELD GROUNDING <br /> HOUSING REQUIREMENTS ROUTE TO BELOW) SYSTEM. C <br /> HYDROSTATIC MONITOR SENSOR -- k4 AWG BARE STRANDED CU ° __ -- 6®® , ° MONITORING PANEL IN — 15"0, 2,500 PSI 2 <br /> FOR DOUBLE WALL VENT III GROUND WIRE TO TANK FIELD BUILDING <br /> TRANSITION CONTAINMENT SUMP GROUNDING SYSTEM 23" CLEAR CONCRETE <br /> --- GRADE _ - ___-_ --- GRADE a FOUNDATION TYP. <br /> 2" BELL.MALE ADAPTER /\� I I'\//�//�//\//\//\% a4 CWiG BARE I GROUND WIRETOr \ II B ✓ // // // // // /� P d ° ° DRAI�bENSATE° <br /> O /� W _-- II ( /��/��/��/\�/��% TANK FIELD GROUNDING <br /> 3" FRP BONDED FITTING \ r� - - III -- / / / / / SYSTEM <br /> d Q ° d PE.R.f <br /> GEOTECHN°ICALL REPaOdRT <br /> d <br /> W/ TEST PORT (TYP.) SUBBASE <br /> OPTIONAL 6" THICK <br /> CONCRETE SLAB <br /> 2" INSIDE 3" DOUBLE OPTIONAL 6" THICK INTRINSICALLY SAFE d <... <br /> WALL FRP VENT LINE. ILII ° CONCRETE SLAB HYDROSTATIC MONITOR SENSOR U 4 -� WIREWAY IN BUILDING 'i+' - a .`°''+ °'G <br /> SLOPE TO TANK AT 1/4" ° i- 12"0.2500 PSI FOR DOUBLE WAIL VENT I . d I - d ;•� ° ° r <br /> PER FOOT MINIMUM. CONCRETE RACK TRANSITION CONTAINMENT SUMP /�11B RA E �E G�OTECMNICAL \PORT / / / <br /> (VACUUM MONITORED) FOUNDATION LIQUID SENSOR �� ��/\\\` \ \ \ \ <br /> L-- 2" FLEX CONNECTOR n1 ' ' 16® m-== _-__®® ==J NON-DISCRIMINATING \/\ \/\ J <br /> �,/�./ - -- 2" FLEX CONNECTOR (TYP.) / / / / '.a <br /> 4"z3" CONCENTRIC ;��i��i /�i��;��; ` ( .) ` `° r FRONT ELEVATION ;�` ` <br /> BRINE FILLED DOUBLE 2" INSIDE 3' DOUBLE WALL /\� ° <br /> REDUCER (TYP.) \/�\/ /,\��\/�\/ LIQUID SENSOR WALL VENT LINE FRP VENT LINE. SLOPE TO / <br /> NON-DISCRIMINATING TRANSITION SUMP TANK AT 1/4" PER FOOT \\ ��/ LTJ <br /> MINIMUM. (VACUUM MONITORED) ° / ° W W <br /> BRINE FILLED DOUBLE <br /> WALL VENT LINE 42" ' I � <br /> TRANSITION SUMP ° ��VE SOILF 15 �r (f) C) <br /> COMPACTED OR NATIVE SOIL \ COMPACTED OR NA(TYPICAL) %\/ ° ° - //\ w H Ln <br /> (TYPICAL) FRONT ELEVATION //N//\��/���! U <br /> Of <br /> SIDE ELEVATION w W <br /> > a � � <br /> = rn O <br /> ON (V N <br /> MW <br /> VENT RISER DETAIL W/ EXISTING HEALY TANK DRAWN 6Y: <br /> REVIEWED BY: <br /> DY <br /> DATE: 7.26.18 <br /> _ SCALE: N.T.S. <br /> SHEET <br /> F -3 <br />