My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:37:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) 68150 (WRR 6133)
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231622_13975 E HWY 88_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Guide System Description <br /> �i Black <br /> iI i <br /> TLS i i Seal-off i i From <br /> Console i i i White Sensor <br /> I F <br /> \�1J2"rigid % <br /> conduit <br /> &Msstwir.eps Epoxy sealed connections in a <br /> weatherproof junction box <br /> Figure 2. Sensor Wiring Installation Diagram <br /> A C From probe, <br /> sensor,or <br /> transducer To console <br /> Make sure that <br /> the ends of cable <br /> sheathing are sub- <br /> merged in sealant Tie wrap <br /> Wire nuts <br /> Instructions: <br /> NOTE: When temperature is below 50°F (10°C), keep 4. Mix thoroughly to a uniform color by squeezing <br /> resin in a warm place prior to mixing (e.g., in an contents back and forth 25-30 times. <br /> inside pocket next to body). 5. Squeeze mixed,warm resin into one end of bag and <br /> 1.Open epoxy sealant package,and remove resin pak, cutoff other end. <br /> 6. Slowly insert wiring connections into sealing pack <br /> 2.Holding resin pak as shown in A,bend pak along long until they fit snugly against the opposite end as <br /> length. shown in C. <br /> 3. As shown in B, firmly squeeze the RED SIDE of the 7.Twist open end of bag and use tie wrap to close it off <br /> resin, forcing it through the center seal and into and position the tie wrapped end up until the resin <br /> BLACK SIDE. jells. <br /> _ CAUTION:Epoxy sealant is irritating to eyes,respiratory system, <br /> 1 and skin.Can cause allergic skin reaction.Contains:epoxy resin <br /> O O and Cycloaliphatic epoxycarboxylate. <br /> Precautions:Wear suitable protective clothing,gloves,eye,and <br /> face protection.Use only in well ventilated areas.Wash <br /> thoroughly before eating,drinking,or smoking. consaes\eP.Y2�xw <br /> Figure 3. Epoxy sealing example <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.