My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2300 - Underground Storage Tank Program
>
PR0231002
>
COMPLIANCE INFO_1987-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:24:08 PM
Creation date
6/23/2020 6:39:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2014
RECORD_ID
PR0231002
PE
2361
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231002_525 W ACACIA_1987-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx.60' Approx.60' <br /> Product Stored: Fuel Oil Fuel Oil <br /> Method and location of Clam Shell test port Clam Shell test port <br /> piping-run isolation: at Piping Sump at Piping Sum <br /> Wait time between applying 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 8:30 8:30 <br /> Initial Reading(Rj): 5 Psi 5 Psi <br /> Test End Time: 9:30 9:30 <br /> Final Reading(RF): 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass 0 Fail 0 Pass 0 Fail ❑Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.