Laserfiche WebLink
� 9 <br /> SWRCB,January 2002 Page of <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Dameron Hospital I Date of Testing: January 12,2012 <br /> Facility Address: 525 West Acacia Street, Stockton,Ca.95203 <br /> Facility Contact: Jacob Wiebe I Phone: (209)461-3157 <br /> Date Local Agency Was Notified of Testing: 12/30/11 by Afford-A-Test <br /> Name of Local Agency Inspector(i(present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: R&D Compliance Testing <br /> Technician Conducting Test: Benjamin F.Duncan Jr. <br /> Credentials: ❑CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br /> License Type: Tank Tester License Number:90-1120/ICC#5246802-UT <br /> Manufacturer Training <br /> Manufacturer Component(s) Date-Training Expires <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Annular Tank X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe#I X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe#2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump X ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ 1 ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ I ❑ I ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: lwewy11 vlJtGsa Date: January, 12,2012 <br />