Laserfiche WebLink
WRITT�N MONITORING AND RESPONSE PLAN <br /> UNDERGRDUND STORAGE TANK MONITORING PROGRAM <br /> This moniton yro am must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of i#in pe . fprmit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641(h) <br /> FACILITYNAME Dameron Hospital Association DATE 3/28/2002 <br /> FACILITYADDRESS 525 West Acacia Street, Stockton, Ca 95203 <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> Jaii Grayson, Plant Operations Manager <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS Continous by Watch Engineer-24 hr.day PIPINGContinous by Watch Engineer-24 hr.day <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location of sensors <br /> Monitoring is performed in the hospital boiler room <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel Leak Alert Model LA-02 Separate Vapor and LiquidMDetntiu <br /> oni or <br /> Name and Model of Line Leak Detectors Leak Alert Model LA-02 Seperate Vapor and Liquig Deni or <br /> and Model of Annular Sensors Leak Alert Model LA-LS <br /> Name and Model of Piping Sensors Leak Alert Model LA-LS- <br /> Name and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes 0 No 0 <br /> Does the turbine shut down if a sensor is disconnected? Yes 0 No 0 <br /> Does the turbine shut down is the monitoring panel loses power? Yes 0 No 0 <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> All alarms and maintenance records. are documented in the Plant Operations Office <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? Maintenance and monitoring is done annually <br /> and recorded by Afforda—Test. This testing and maintenance is done each year in Janua- <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment.All watch engineers are trained to turn off the pump in case of an emergency <br /> and notify supervisor in case of an emergency. <br /> I.mstemi-le\USllmonitoringplan.doc <br /> 1/24/2002 <br /> i <br />