Laserfiche WebLink
04/09/2002 16:00 2099560-9 DAMERON'S CDP PAGE 02 <br /> EMERGENCY REPSONSE PLAN <br /> 'UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> T6ismonitoring program must be kept at the CYST location at all Barnes_The information on this monitoring <br /> program are conditions of the operating permit.The permit holder must notify San Joaquin County <br /> Euviroutal Health Department,phone(209)468-3420 of any changes to the monitoring procedures,unless <br /> required to obtain approval before making the change.Required by CCR 2632(d)and 2641(h)_ <br /> FACII:ITYNAMEDameron Iiaspital Association DATE 3/28/2002 <br /> FACTLrj ADDbtE$S. 525' W. Acacia Street. - Stockton, Ca 95203 <br /> 1.List the name(s)and title(s)of the people responsible for <br /> Jaii,Grayson, Plant. 0perations Manager <br /> 2.If an unauthorized release occurs,how.will the hazardous substance be cleaned up? <br /> Notes If a released hazardous substance reaches the environment,enters a storm drain,or <br /> Increases the firetexplosion hazard,then San Joaquin County Environmental Health <br /> Departmentmust be notified immediately.If a hazardous substance is not cleaned up from <br /> the secondary containment within 8 hours,or deteriorates the secondary containment,then <br /> San Joaquin County Enviroutaental]Health Department must be notsled witbin 24 hours. <br /> Call(209)468-3420. <br /> tr1'b: willcall CTIEMTREC 1-800-424-9300 for clean up and notify <br /> county OEC iwmediate�y. <br /> 3.Descn`be the proposed method and equipment to be used for cleaning up hazardous spills. . <br /> We would isolate the area, deny access and call our clean up company'. <br /> 4.Describe the proposed availability and location of the spill control equipment. <br /> Eguil,+men' 11 ke'Dt in the boiler room and available to all staff. <br /> S:Describe.the proposed method of disposal for the spent spill control equipinent.ie:spent absorbent <br /> All disposal, is dome through outside servilte <br /> 6.Describe the maintenance schedule for the cleanup equipment. <br /> All disposal aud.maintenance is done through outside, service. <br /> liW&t"i-MSTAemagmyra"nse doc <br /> if24d2002 <br />