My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2300 - Underground Storage Tank Program
>
PR0231002
>
COMPLIANCE INFO_1987-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:24:08 PM
Creation date
6/23/2020 6:39:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2014
RECORD_ID
PR0231002
PE
2361
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231002_525 W ACACIA_1987-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Employee Training Page 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job training. X <br /> Monthly Ins ection— <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 02-01-13 <br /> Spill Bucket testing completed(within past 12 months) X 02-01-13 <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) X <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) X 2-1-13 <br /> Tank Tightness(Usually only after construction or when using SIR) <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X 1-12-12 <br /> Other testing or maintenance completed as required. List them below: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED Yes No NA <br /> Comments: BUCKET FAILED <br /> UNABLE TO COMPLETE PLLD TEST <br /> Training completed today <br /> Items Requiring Follow-up Actions: <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator, but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency, off-site at a readily <br /> available location. <br /> 99/79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.