My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
2300 - Underground Storage Tank Program
>
PR0231058
>
COMPLIANCE INFO_1986-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 3:53:52 PM
Creation date
6/23/2020 6:40:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1998
RECORD_ID
PR0231058
PE
2361
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
01
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231058_620 W DR MARTIN LUTHER KING JR_1986-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I WATER RESOURCES CONTRO OARD 4..:. <br /> FORM `B'� UND ROUND STORAGE TANK PRO A <br /> TA TANK PERMIT APPLICATION INFORMATION <br /> ( �COMPLETE A SEPARATE FORM WITH THE FOLLOWING INFORMATION FOR EACFI TANK. C�i!iOPN;� <br /> MARK ONLY ❑1:NEW INTERIM <br /> IM PER Q 3 RENEWAL PERMIT ®5 CHANGE OF INFORMATION ❑7 PERMANENTLY CLO K I Q <br /> ONE ITEM p INTERIM PERMIT ❑4 AMENDED PERMIT ®6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: 2..Q SGP_vCC01 FARM TANK-YES NO <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY I CD <br /> CD <br /> A. OWNERS TANK ID q B. MANUFACTURED BY: -4 <br /> C.YEAR INSTALLED ' 00 <br /> D. TANK CAPACITY IN GALLONS: Q <br /> If. TANK 96NTENTS IF(AL1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. 1 MOTOR VEHICLE FUEL 0 2 PETROLEUMC. <br /> i UNLEADED E012 LEADED 3 DIESEL <br /> ®3 CHEMICAL PRODUCT, 4 OIL ;. , <br /> PRODUCT 4 GASAHOL ❑5 JET FUEL ®6 AVIATION GAS <br /> 5 HAZARDOUS ❑80 EMPTY `®95 UNKNOWN ❑2 WASTE ❑7 METHANOL ❑99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.Y <br /> C.A.S.M <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,&D <br /> A TYPE OF ❑ 1 DOUBLE WALLED 3 SINGLE WALLED WITH EXTERIOR LINER ❑95 UNKNOWN <br /> SYSTEM El SINGLE WALLED 4 SECONDARY CONTAINMENT 99 OTHER <br /> B.TANK ❑i STEEL/IRON ❑2 STAINLESS STEEL ❑3 FIBERGLASS ®4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑5 CONCRETE El 6 POLYVINYL CHLORIDE M 7 ALUMINUM 8 100%METHANOL COMPATIBLE FRP <br /> El 9 BRONZE M 10 GALVANIZED STEEL M 95 UNKNOWN ®99 OTHER <br /> C.INTERIOR I RUBBER LINED ®2 ALKYD LINING ❑3 EPDXY LINING 4 PHENOLIC LINING <br /> LINING ❑5 GLASS UNINO ❑6 UNLINED 95 UNKNOWN <br /> IS LINING MATERIAL COMPATIBLE WITH 100 METHANOL? ❑YES ❑NO F]99 OTHER <br /> D.CORROSION ❑i POLYETHLENE WRAP ®2 TAR OR ASPHALT M 3 VINYL WRAP ®4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑5 CATHODIC PROTECTION 91 NONE 0 95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A.SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B.CONSTRUCTION A U 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> A U 1 STEEL/IRON A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> C.MATERIAL A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL CLAD W/FRP A U 8 100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 95 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> LPPS <br /> 1 VISUAL CHECK P S 2 INVENTORY RECONCILIATION P 8 3 VADOSE WELLS P 8 4 ELECTRONIC MONITOR P S 5 GROUNDWATER MONITORING WELLS <br /> 6 PRECISION TESTING P 8 7 PRESSURE TESTING P 8 91 NONE P 8 95 UNKNOWN <br /> P 8 99 OTHER <br /> V1. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> L i.ESTIMATED DATE LAST USED(MO/YR) 2.ESTIMATED UANTITY <br /> OF <br /> SUBSTANCE REMAINING IN 3•WAS TANK FILLED WITH <br /> GALLONS INERT MATERIAL? ❑YES NO <br /> THIS FOR"AS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE,IS TRUE AND CORRECT. <br /> APPLICANTS NAME(PRINTER)6 SIGNATURE) <br /> DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY N JURISDICTION Rt AGENCY N <br /> FACILITY I9D�I TANK ID# <br /> (/ 6 <br /> Lj� <br /> Ll <br /> CURRENT LOCAL A<ENCY FACILITY ID N <br /> APPROVED BY NAME PHONE N WITH AREA CODE® ? <br /> PERMIT NUMBER PERMIT APPROVAL DATE <br /> PERMIT EXPIRATION DATE <br /> CHECK Y PERMIT AMOUNT SURCHARGE AMT. ®`s` <br /> FEE CODE 9 <br /> � <br /> RECEIPT N SY:� <br /> FORM a(6 29-88) THIS FORM MUST BE ACCOMPANIED FACILITY/SITE APPLICATION, FORM `A',UNLESS A NT FORMA' HAS BEEN FILED <br /> DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.