My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:53:15 AM
Creation date
6/23/2020 6:40:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- ^ �� <br /> ` �� �l yU� - �w����^� ��� <br /> - '' ' ` ~~="' ' \� `�~�`~" `+`°- - -' ' ~-~ `=- / <br /> Maintenance Inspecting/Verifying 95% Level (Without <br /> The 708-2)OSeries Overfill Prevention Valve has no Removing from Tank) <br /> periodic maintenance requirements. FOR DIMENSIONS "4^ & ^8^: Refer to the"installation <br /> However, if the drop tube and valve assembly is removed record sheet"or re-measure and re-calculate per figure 1 <br /> from the tank (for inspection oroewico). inspect the <br /> drop tube seal for wear/damage (Figure 1S). Replace if 1, Measure Dimension ''Z^ (Figure 18) <br /> necessary. "2" (Upper drop tube flange m <br /> edge of upper tube adaptor) <br /> 2. Verify using the calculation below <br /> (Drop tube seal surface to <br /> g-1, bottom of tank) <br /> u rientation) —1 (95%Volume from tank chart) <br /> be Gasket Instal ed "B" I <br /> - (Subtract) <br /> [�.Y (114mm) (95%Shutoff level offset) <br /> Figure 16:Inspect Gasket <br /> = <br /> AdAdditionally,Additionally, if the upper or lo (Equals)tube is � <br /> unthreaded/removed from the OPV, the C-hng(o)should <br /> boreplaced (Figure 17). Same value 8s '1 <br /> indicates correct iOSC@U8Uon <br /> Inspect 0-ring <br /> M!@SUF8 <br /> ��----------------- "�r" <br /> 4�� <br /> (114 mm) <br /> Inspect O-ring ---if <br /> +-----'�U| <br /> BU| @ N Q 0 \UU <br /> Figure 18:'D��mns�m ��NYcadonA�mr�s�/��zn <br /> F�uro /7�h4neot����Am <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.