My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:53:15 AM
Creation date
6/23/2020 6:40:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 'lei A1100 Overfill <br /> EMCD Mo <br /> IWHEATON KETAL. Prevention <br /> Field ii Test Procedure TP-A1100 <br /> r Primary FloatFlapper Valve <br /> Service is it d: <br /> • EMCO Model A0081-1101 test tool • Scribe tool <br /> saw <br /> CAUTION: <br /> 1. Always barricade work area to keep pedestrians and vehicles from accessing the storage tank area during preventive maintenance <br /> and/or compliance testing of the phase I system. <br /> Securing.the FlaWer Valve: <br /> 20118 <br /> i ''�� t E � i6 'f 9• u� t <br /> HEAL"' <br /> �:NV1120Nt�1�.N-ft�L t11;A <br /> 1?t?PAi2TioIEN`l' <br /> fiR,riY��(i i II.n: <br /> b <br /> Step 1: Remove the spill container lid, Step 2: Remove the Model A1100 OPV <br /> fill cap and adapter from the tank fill from the tank fill riser. <br /> riser. Note: only remove manhole cover <br /> and water shroud system if necessary. <br /> w <br /> 9 <br /> Primary <br /> Float <br /> r ,t <br /> # } <br /> ;ww <br /> J�tliFj fir." } <br /> Step 3: Place the Model A1100 OPV on Figure 1: Correct position, primary float Figure 2: Improper position, primary <br /> its side with the primary float facing facing downward. float facing upward <br /> downward. Refer to Figures 1 and 2 <br /> for details. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.