My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:53:15 AM
Creation date
6/23/2020 6:40:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0������W� ���� � Equipment�� <br /> ������ ��0 ����0������ <br /> �������� Phase � 0�� � <br /> �� � _�~����m��� mm��� � � <br /> K���K��'���� ����������'��� �K ����~��������K��� <br /> Required�� ~' ^-n-~�~'~ — Maintenance <br /> ~- ~~ ~� <br /> Spill Containment Manholes Drop Tube Mounted Overfill Prevention <br /> ^ Perform inspection and maintenance duties atleast Valves <br /> onceeyeac . Perform inspection and maintenance duties otleast <br /> ° Remove any standing liquid and dispose ufitproperly. once ayear. <br /> , Brush all buildup off ofthe brass drain valve screen (if ^ Inspect the inside ofdrop tubes for broken dip sticks or <br /> applicable). noticeable damage to the valve flapper. If any damage is <br /> ^ Remove all dirt and foreign materials. ubaemed, then the valve must be replaced. <br /> ° Scrape all foreign materials away from the tank lid , |fithas not already performed during drain valve testing, <br /> sealing surfaces. leak test the Drop Tube assembly using the established <br /> ~ Should itbenecessary toreplace odrain valve due ho "Pressure Integrity Test"for Drop Tube/Overfi|| <br /> breakage orconsiderable contaminationPn*vantionDevice(TP2011CorTP2O1.1D),on buildup, use � <br /> EBVV7O5'337-19Replacement Drain Valves only. EBVVdoesn't require that the drop tube bepulled for <br /> ~ Perform aleak test using the established "Pressure inspection unless damage ionoted. Should local authority <br /> Integrity Test"for acombination ofDrop Tube, Drain require removal ofthe drop tube, the following seals and <br /> Valve, and Overfill Prevention Device (TP2U1AD). inspection steps are nooeauary�� <br /> ^ Use SUO79Drop Tube Isolation Test Kit. ^ Replace Drop Tube Isolation Gland (if applicable) seal <br /> kit-90090Rotatable���i� Fill & VapK�r^�K�a�»ters, Dust Caps & 'SO090 <br /> Probe Riser Adapters ` Replace Drop Tube Flange Gasket-111D2'O1 <br /> ^ Perform inspection and maintenance duties atleast ° Inspect the Tank Bottom Protector for freedom nf <br /> once ayear. movement. Repair orreplace ifnecessary. <br /> ° Inspect all product and vapor riser dust cap seals for ° Inspect OPD components, use instructions onE8VV <br /> damage. |fdamage ioobserved, replace the seal with from 6329. <br /> either the Aluminum Vapor Cap Seal orthe Nylon , Inspect drop tube joint sealant. Repair with EBVVpart# <br /> Product Cap Seal, 11372-01 only. <br /> ^ Perform Rotatable Adapter maintenance as specified by Ball Floats & Extractor Valve Bodies <br /> Phi|'TiteEnbarprioeu. Inc. Perform established"Static ^ Noannual maintenance is required. <br /> Torque Tbot^. TP2U1.18. <br /> Pressure Vacuum Vent Valves <br /> ^ Leak testing should beaccomplished during the <br /> , Perform the required maintenance euspecified by <br /> "Pressure Integrity Test"for adrain valve orDrop <br /> Tube�WountedOvnr5||Valve,Tp201.1CorTp2O1.1D. Husky Corporation, <br /> Annual maintenance ofthe probe riser cap assemblies Adleast once every three years, unless otherwise specified <br /> ionormally not required. Whenever probe service io byalocal authority, perform the established"Static <br /> necessary, inspect the service cap seal for damage and Pressure Performance Test" (TP2O1.3). <br /> replace it, ifnecessary, otthat time with aProbe Riser <br /> Cap Seal. <br /> Please contact Technical Support ifassistance ioneeded. <br /> gco. <br /> ��� ��rerm��lin� Fueling Systems <br /> 3760 Marsh Road <br /> Madison,YV|su71o.U.S.A. <br /> Tel:+1 608e388786 <br /> Tel:USA&Canada 1moouoso7ur <br /> Tel:Mexico oma000mnmo <br />
The URL can be used to link to this page
Your browser does not support the video tag.