My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:09:44 AM
Creation date
6/23/2020 6:40:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1997
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1985-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. 7,11 -&* 7,Ob�S 2 S�o S-3U- 9� r. _ <br /> Name of Supplier.Owner or Dealer Address No.and Streetfs) City state Date of Test - <br /> 15. TANK TO TEST 15a. BRIEF DIAGRAM OF TANK FIELD 16.CAPACITY From <br /> ❑ Station Chart <br /> NoA� / {� EQS+ Nominal Capacity 101000 ❑ Tank Manufacturer's Chart <br /> Iden ity by position 1 1 �� <br /> Gallons ❑ Company Engineering Data <br /> ,2 s'�os� U n�}//► ❑ Charts supplied with <br /> e ` , ca most accurate �7 /t 0 <br /> Brand and Grade capacity chart available f V{{JJ ❑ Other <br /> TOi1X Gallons <br /> Total Gallons <br /> 17. FILL-UP FOR TEST Gallons ea.Reading <br /> Stick Water Bottom <br /> before Fill-up ® in. in. Inventory <br /> to A" Gallons Tank Diameter -�i�1 1/�r� <br /> L a-� <br /> 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ❑Water in tank ❑ Line(s)being tested with LVLLT <br /> See manual sections applicable.Check below and record procedure in log(27). ❑High water table in tank excavation 9 <br /> Use maximum allowable teat pressure for all tests. 19. TANK MEASUREMENTS FOR Transfer total to line 25a <br /> Four pound rine does not apply to doublewalled tanks. TSTT ASSEMBLY <br /> 21. VAPOR RECOVERY SYSTEM El stage 1 ❑stage 11 <br /> Complete section below: <br /> • Bottom of tank to grade'............................ in. <br /> Add 30"for"r'probe may........................... 30 in. 24b.COEFFICIENT OF EXPANSION <br /> 1. is four pound rule required? Yea ❑ No ❑ Total tubing to assemble—approximate............. <br /> 'L-7 in. RECIPROCAL METHOD <br /> Type of Product...... <br /> 2.Height to 12"mark from bottom of tank in. <br /> 20. EXTENSION HOSE SETTING <br /> Tank top to grade................................... in. Hydrometer Employed.................................. 4 H <br /> Extend hose on suction tube 6"or more Temperature In Tank ala <br /> 3.Pressure at bottom of tank P.S.I. below tank top...................................... in. After Circulation......................................... / ♦ °F <br /> Temperature of Sample................................. G Q°F <br /> 4. Pressure at top of tank p S I 'If Fill pipe extends above grade,use top of fill. <br /> 22. Thermal-Sensor reading after circulation Difference(+/-)......................................... °F <br /> �]Z digits{,{. <br /> Depth of burial in. 4 J_7+ °F Observed A.P.I.Gravity ................................. <br /> ? <br /> / <br /> Between ff,, <br /> 23. Digits per°F in range of expected change 32 Reciprocal Page e <br /> digits <br /> Tank dia. in. <br /> COEFFICIENT OF EXPANSION (Complete after circulation) IM . 1474 6.77 Za <br /> 24a. Corrected A.P.I.Gravity Total quantity in Reciprocal Volume change in <br /> lull tank(16 or 17) this tank per°F <br /> Water table in. <br /> Observed A.P.I.Gravity................................... Transfer to Line 26s. <br /> NOTES: <br /> Hydrometer employed................................... H <br /> 24c. FOR TESTING WITH WATER a"Table c a o <br /> Observed Sample Temperature......................... °F <br /> Corrected A.P.I.Gravity Water Temperature after Circulation <br /> @ 60°F.From Table A.................................... Table C................................................ °F <br /> Coefficient of Expansion Coefficient of Water <br /> The above calculations are to be used for dry soil conditions to for Involved Product Table D................................................ <br /> establish apositive pressureadvantage,or when using the four pound From Table B............................................ <br /> rule to compensate for the presence of subsurface water in the tank Transfer COE to Line 25b. Added Surfactant? ❑Yes ❑No Transfer COE to Line 25b. <br /> area. <br /> Refer to N.F.P.A. 30, Sections 2-3.2.4 and 2.7.2 and the tank 25. (a) x (b) _ (c) gallons <br /> manufacturer regarding allowable system test pressures. Total quantity in Coefficient of expansion for Volume change in this tank <br /> full tank(16 or 17) involved roduct per°F <br /> 26. (a) l0•?774,742 + � _ ,()2b�0This is <br /> Volume rhanga per°F(25 or 24h) Digits per°F in test Volume change per digit test <br />
The URL can be used to link to this page
Your browser does not support the video tag.