Laserfiche WebLink
0GRHL r.Michael <br /> June 4, 1998 <br /> ® OUP INC.INc. Page 2 <br /> e. Enclosed is a revised Page 5 of the Application for UST Closure Permit with the <br /> new information for the registered soil hauler who will perform the work. <br /> f. Enclosed is the completed Backfill Excavation Certificate. Maness will submit <br /> the load tickets within 30 days of project completion. <br /> 3. Tank Removal: <br /> a. Enclosed are 3 (three)copies of revised site specific plans. <br /> b. The shoring requirements will be determined on site, see sheet FSP-2, Section III, <br /> Part 3,Note 3.7. <br /> c. Location of the monitoring panel is shown on Sheet SD-3. See Key Notes 13.5, <br /> 13.10,and 16.1. <br /> d. The dispenser pan dimensions is shown on Sheet G-8. See Dispenser Sump <br /> Frame. <br /> If you have any questions or require additional information please feel free to contact me. <br /> Sincerely, <br /> RHL Design Group,Inc. <br /> Debbie Herzog <br /> Project Administrator <br /> Enclosures <br /> cc: Mr.Paul Parham, Southland Corporation <br /> Mr.Bob DeNinno,Southland Corporation <br /> F: ncM011.20%DEH-MK <br /> BELLEVUE, WA LA HABRA. CA SACRAMENTO, CA SCOTTSDALE. AZ <br />