Laserfiche WebLink
EW UST INSTALLATION INSPECTION RECORD <br /> FACILITY NAME: o%& � !� 2 6 3 � ADDRESS: �67,7 <br /> ;FACILITY ID# ANK# .? UL#/I 4oj(ziTANK MODEL/MATERIAL <br /> CAPACITY: PRODUCT: ut, R.E.H.S: <br /> A I <br /> P NALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T ® G <br /> O I 3 <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED P <br /> DATE <br /> I <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br /> I <br /> 3a .A UST INSTALLATION PLANS APPROVED <br /> T• INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM:? IN SOAP: PSI: HRS/ rj(� BRINE(LIQUID ANNULAR): OTHER: <br /> PRIMARY TANK TEST: PSI: HRS16 : 3D <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br /> v PIPING INSPECTIONS <br /> � PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) v (CCR 2636 (e)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br /> 12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br /> FINAL INSPECTION <br /> �z-/ ti j ✓ 13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br /> 14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL)710(d &%L53Sa 2632 (c) (2)) <br /> i 15. PERFORMANCE TEST OF LINE LEAK DETECTIONU Cil (CCR 2643 (c) (1)) <br /> i <br /> 16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br /> 17. BALL FLOAT VALVES INSTALLED <br /> I <br /> 18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br /> 19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br /> 20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br /> 21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br /> 22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br /> 23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> 24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br /> COMMENTS: <br /> EH23-006 9/95 <br /> 10 <br />