My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1998-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:51:39 AM
Creation date
6/23/2020 6:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2002
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1998-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />TechnicM Specifitation <br />Compatible, with.... <br />..100% gasoline; methanol, I and ethaxiol <br />...Any combination of the above <br />...100% diesel <br />......Lip to 1 S%o MTBE <br />.. Kerosene /,jet A <br />• aise with any line/pipe system (steel; fiberglass, flexp` e) up to 4W'nil <br />blee—Oack <br />:.For use with any UL listed pumps: <br />1/,H..P.., 3/4 H.P., and 1--1 2 H.R, 20-50 psi'volulne-to 90-GPM <br />• '-Certified to handle .1:0 feet oihead.. pressure <br />• <br />Combination.,fine check/pressure relief prevents drainback into the tank <br />• -Hardened 17-4 stainless steel metering pin and poppet <br />Unique upper-.cylinder. piston functions without a pressure. relief <br />®-Can be installed in. 941)r position <br />• Tamper-proof boltsaccommodate.wire seal to preventtampering <br />• For installation in; any submersible pump .with a 2=inch NPT'port, or a <br />2-inch leak.detector adapter tee <br />• Leak detector is nickel-plated, schedule 40 cast iron construction <br />• Teflon 304/stainless steel energized.piston%poppet seals <br />• MIL Spec. #R=83248 Fluorocarbon. 0-rings <br />•. Other components in contact with fluid- include 660 bronze,* 6061 U aluminum, <br />550 Dehrua., GC 70 Flex urethane, spring steel <br />• UL listed and certified (3 GPH 10 psi) for line systems up to 130 gallons <br />•.Veiit line must be unobstructed, leak-proof, and connected to a zero pressure port <br />
The URL can be used to link to this page
Your browser does not support the video tag.