My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1998-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:51:39 AM
Creation date
6/23/2020 6:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2002
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1998-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Pipin <br />April <br />Total• ttrePipe •- • <br />ns <br />PART NO. <br />DESCRIPTIONVacuum <br />Packaging <br />Operating <br />Pressure/ <br />: <br />(psi) <br />Actual <br />Avg. <br />Burst <br />(psi) <br />Min. <br />Bend <br />Rad <br />(in) <br />Weight <br />(Ibslft) <br />Operation <br />Temp(cq <br />-20 to 120 <br />UL <br />MH16395 <br />ULC <br />CMH1385 <br />PP0500 <br />UT Primary Pressure Pipe Gasoline <br />25V Coils <br />250 psi <br />1250 <br />6 <br />0.12 <br />PP0750 <br />+ 3/4' Primary Pressure Pipe Gasoline <br />f <br />250 Coils <br />250 psi <br />1250 <br />6 <br />0.19 <br />-20 to 120 <br />� <br />MH16395 <br />I <br />CMH1385 <br />PP1000 <br />1' Primary Pressure Pipe Gasoline <br />250' Coifs <br />250 psi <br />1250 <br />6028 <br />-20 to 120 <br />MH16395 <br />CMH1385 <br />PPi500 <br />1-1/2' Primary Pressure Pipe Gasoline <br />500'-600' / skid <br />50 psi <br />374 <br />6 <br />0.55 <br />-20 to 120 <br />MH16395 <br />CMH1385 <br />I—ppi-501 I <br />1-1/2' Primary Pressure Pipe Alcohol <br />500'-600' / skid <br />50 psi <br />523 <br />6 <br />0.55 <br />-20 to 120 <br />MH16395 <br />CMH1385 <br />CP1501 I <br />1-1/2' 0mniflex Pipe Alcohol <br />50p-6W/skid <br />50 psi <br />680 <br />15 <br />0.84 <br />-20 to 120 <br />MH16395 <br />CMH1385 <br />PP2500 12-1/2" <br />Primary Pressure Pipe Gasoline <br />Nom. 300'-400' /skid I <br />50 psi <br />603 <br />12 <br />1.05 <br />-20 to 120 <br />- <br />CMH1385 <br />PP2501 12-1/2' <br />Primary Pressure Pipe Alcohol <br />Nom. 300'-400' / skid ( <br />50 psi 1 <br />660 <br />12" <br />125 <br />-20 to 120 <br />MH16395 <br />CMH1385 <br />SP2501 <br />2-1/2' Primary Suction Pipe Alcohol I <br />250' Col <br />26' Hg Vac <br />WA <br />24 <br />1.02 <br />-10 to 120 <br />MH15595 <br />CMH1385 <br />VP2501 <br />2-1/2' Vent Pipe Alcohol I <br />250' Coil <br />25 psi I <br />100 <br />24 <br />125 <br />-10 to 120l <br />MH15595 <br />CMH1385 <br />Notes: <br />I. For special applications these operating parameters may be extended. <br />Contact TCI Engineering for specific recommendations. <br />2. Contact Total Containment for current updated listing information <br />PSPd00.5A <br />
The URL can be used to link to this page
Your browser does not support the video tag.