My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1998-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:51:39 AM
Creation date
6/23/2020 6:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2002
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1998-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1: <br /># Q' <br />Three complete sets of Os(include manufacturer's specification so for proposed equipment to be installed). <br />2.. <br />CAPACITY <br />Plans drawn to scale in non -erasable print. <br />3. <br />Ot <br />Plot plan to show location of tanks and all associated piping. <br />4. <br />Ot <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. <br />CK <br />Tank cross-sectional diagram. <br />6. <br />OC <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />04 <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />Fea. Unl. <br />Prem Uni. <br />Article 3, Section 2631 (b) & 26351 <br />8. <br />j�` _ <br />Verification of product compatibility with the tank(s), piping, monitoring <br />U.L. LISTED <br />device(s), epoxy or silicone glues, etc. <br />9. <br />^ <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />'Ye, to <br />At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />12. <br />TANK COMPOSITION <br />TANK # <br /># Q' <br /># OZ # # <br /># <br />CAPACITY <br />I ® tgoo <br />10,000 <br />MANUFACTURER1niaiM� <br />'Total <br />vmnt <br />Wal <br />6o Wnn7O,' <br />COMPOSITION <br />e) <br />MODEL <br />J5T 510,HJT <br />NO <br />PRODUCT <br />Fea. Unl. <br />Prem Uni. <br />CORROSION PROTECTION <br />Hi�P�+ <br />NDP <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />Y <br />'Ye, to <br />13. TANK(s) To BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />® (1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)l <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.