My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_1998-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 9:51:39 AM
Creation date
6/23/2020 6:40:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2002
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_1998-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form I <br /> Source Test Results <br /> Static Leak Test <br /> Date: 09/18/2002 Time: 08:30 Application No. N-748 <br /> GDF Name and address: 20632 4627 DA VINCI DR. <br /> Stage II system(check one): Vapor Balance [ ] Single Hose M.P.D. [X ] <br /> Vacuum Assist [X ] Type: VAPOR VAC <br /> Stage I type(check one): Two point [X ] Manifolded? Yes [X ] <br /> Coaxial [ ] No [ ] <br /> Tank# 1 2 <br /> Product grade re alar prendum <br /> Actual tank capacity(gallons) 10028 10028 20056 <br /> Gasoline volume(gallons) 5674 5555 11229 <br /> Ullage(gallons) 4354 4473 8827 <br /> Initial pressure of UST,inches H2O 2 2 <br /> Number of nozzles served by tank 4 4 <br /> Test location: (A)Stage I vapor <br /> coupler of(B) Stage H riser a <br /> Initial Pressure,inches H2O(2.0) 2 <br /> Pressure after 1 min. (inches H2O) 1.98 <br /> Pressure after 2 min. (inches H2O) 1.96 <br /> Pressure after 3 min. (inches H2O) 1.95 <br /> Pressure after 4 min. (inches H2O) 1.94 <br /> Final Pressure after 5 min. (inches <br /> H2O) 1.93 <br /> Allowable Final Pressure: Table IA, <br /> Table 1B,Equations 9.1, 9.2 1.89 <br /> Test Status [Pass or Fail] Pass <br /> Tests Conducted By: MLEVESQUE <br /> Test Company: TANKNOLOGY Date of Tests: 09/18/2002 <br /> Tests Witnessed By: Tom <br /> GENSH-Rev 8/7/2002 Work Order#: 2223783 <br />
The URL can be used to link to this page
Your browser does not support the video tag.