My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URBK 5/6 SDP Repair Instructions <br /> W.: <br /> for Shallow Dispenser Pans (con't) <br /> STEP 4 <br /> • Wrack the new repair boot around the pipe. <br /> • If needed,move the upper insert out of the way <br /> • Solvent weld using Zip-Tite- <br /> • Use 2 band clamps to hold boot together while curing. <br /> Step 6 STEP 7 <br /> Slide metal ring over the repair install the flange nuts and snug to <br /> boot and then over the studs pan floor. <br /> • Slide down the upper insert into the <br /> STEP 5 top of the repair boot. <br /> • Apply"sealer'to pan floor&bottom of Install band clamps&tighten. <br /> boot. y DO NOT exceed 60 inch pounds of <br /> • Rotate the fill port on the repair boot torque. <br /> for easy access <br /> • Then set the repair,boot over the studs-.- <br /> 7�- <br /> TOOLS REQUIRED: FILL Volume: (per repair boot) <br /> STEP 8 Gloves and Static Mixer If using 1.5"Pipe <br /> Fill boot with DBF 11. 5/16"Nut driver(Band Clamps) Volume of DBF 11 needed = 4 Oz <br /> dr Nut-24 <br /> 1 needed= I Oz <br /> 0 driver(Flange nuts) Volume of Zip Tite <br /> DAG Caulk Gun(for DRP&DBF 11) Volume of DBB V needed = 1 Oz <br /> DAG III Caulk Gun(for DBB V) Volume of DRP needed = 1 Oz <br /> I <br /> PRODUCTS NEEDED: f using 2"Pipe <br /> DBC Cleaner Volume of DBF 11 needed = 1 Oz <br /> Zip-nte Solvent Welding Liquid Volume of Tip Tite needed= 1 Oz <br /> DBF 11 Polysulficle Liquid volume of DBBV needed = 10z <br /> DRP Polysulfide Paste(for Poly Sumps] Volume of DRP needed = 10z <br /> DBB V Bonder(for Fiberglass sumps) <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 60 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.