Laserfiche WebLink
1 <br /> TL *1 LINE & LD Test WO <br /> Tanknology <br /> TOPS Data Entry Date <br /> Tank# I Line# Praducl: Presstire"011Suction Pum Make ' <br /> Material. length(ft) I Diameter(in) Test PSP Seexlnd8ry Eontadnme <br /> LINE TEST Reading A Time Level(cm) Level Chg- Vol.Chg Proj.GPH Compression Test&Bleedback <br /> Tested from; START (ant) x 0 00549 x 6 Zero Pressure Leve[ <br /> STP 1st 10-min Test Pressure Level <br /> Dtsp. 2nd 10-min Level Change(cm), <br /> Reiro<T I 3rd 10-min End Zero Pressure Levet: <br /> impact Valves 41h itt.-Min Bleedback(cin): <br /> Operational? 5th 10-min Final Leak Rate GPH. <br /> Y N 6th 10-ml Line Test Result(P I F} <br /> 137 <br /> e117 <br /> LD Result Ser.# & Operating PSI Hatdmg PSI Leak Rate 1 7 milmin h <br /> Make/Model Resiliency(mi) Metering PSi Opening Time(s) PASS I FAIL <br /> LD Retest Ser, Operating PSI HoWn PSI Leak Rate mtimin gph <br /> Makelmodei Resifiency(mi) MelgaQq PSI Opening Time(s) PASS X FAIL <br /> Tank# Llne# Product: ress or Suction Pum Maker <br /> Material Length{fl}: Diameter(in) 'lest PSI. Secondary Containment= <br /> LINE TEST Reading# Time Level(cm) Level hg Vol.Chg, Prq GPH Compression Test&Bleedback <br /> Tested from: START (cm) x 0 010549 x 6 Zero Pressure Level <br /> STP tst 10-min 'Test Pressure Level <br /> Disp, 2nd 10-min Level Change(cm). <br /> Retro-T 3rd 10-rein End Zero Pressure Level; <br /> Impact Valve 4th 10-min Bleedback(cm): <br /> Operational? <br /> 5th 10-min Final Leek Rate GPH: <br /> Y N <br /> 6th 10-min Line Test Result(P i F) <br /> LD Result Ser # O eating PSI HaJdi PSI Leak Rate ml/min gph <br /> Make/Model Resiliency(ml) 6kDMetering PSI 9 Openang Time(s) PASS i FAIL <br /> LD Retest Ser # O satin PSI Holding ASI Leak Rate mi/min Oph <br /> MaketModel 'Resiliency(ml) Metenng PSI Opening Time(s) PASS 1 FAIL <br /> Tank# Line# Product Pressure or Suction Pump Make: <br /> Malerial: Length(ftp' Diameter(in) Test PSI: Secondary Containment <br /> LINE TEST Reading## Time Level(cm) Levet Chg Vial,Chg. Proj.GPH Compression Test&Bleedback <br /> Tested from' START (air) x 0.00549 x 6- Zeno Pressure Level <br /> STP 1st 10-min Test Pressure Level. <br /> Disp, 2nd 10-min Level Change(crit): <br /> Retro•T I 3rd 10-min End Zero Pressure Levol; <br /> Impact Valve 4th 10-min Bleadbaek(cm),. <br /> Operational? 5th 10-mm Final Leak Rate GPH <br /> Y N <br /> 6th 10-min Line Test Result(P 1 F) <br /> LD Result Ser.# 020rating PSI Holding Pat Leak Rate milmin gph <br /> Make/Model Resiliency(mi) Metering PSI Opening Time tsp PASS i FAIL <br /> LD Retest Sar.# Operating PSI Holding PSI Leak Rate milmin g h <br /> Make/Model * { / ResiiienGy(ml) fAetering PSI Opening Time(s) PASS T FAIL <br /> Comments: kf 1! tri <br /> Doc#QP06-02-FFOI Printed copies uncontrolled FF-01 TI 0- & A Field Form•Rev B,As W1212006 Check DIMS tar current version. <br />