My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stop 7: (See Figure 4) bucket by checking the gauge in the base of the spill <br /> If necessary, the height of the spill container can be container. If water or other contaminants are found <br /> adjusted by±1"(2.5cm). If it is necessary to they must be disposed of with disposable towels. <br /> increase height, install adjusting system beneath Dispose of towels safely and per all applicable local, <br /> tabs on mounting ring. Add shims as needed and state and federal codes.Check that cover is in good <br /> adjust with screw. condition and properly identified. Replace cover and <br /> Note: The adjustment should not be more than seal as necessary. Inspect the bucket walls for <br /> 7;'fro-m the initial length of the unit. cracks, bulges or holes. If any exist, have that spill <br /> container barricaded and contact maintenance <br /> Stop 8: personnel immediately for repairs. <br /> Where applicable, upon preliminary installation Semiannually: Follow all state and local required <br /> perform the CARB Test Procedure TP-201.10 or hydrostatic or vacuum testing on the primary and <br /> equivalent. This Test Procedure will check the seals secondary buckets. Inspect and clean the interior of <br /> between the drain valve, nipple, bases, and the spill container and drain valve screen. Remove <br /> rotatable adapter. accumulated dirt and grit. Where applicable, test the <br /> Note:Follow all state and local required testing drain valve using CARR procedure TP-201.1C or <br /> on the primary and secondary buckets. TP-201.1 D. If the drain valve passes testing no <br /> further maintenances required. If the drain valve fails <br /> Step 9: (See Figure 7) testing, remove the valve,soak in water and use <br /> Verify torque on mounting ring bolts. Torque to be high-pressure air, if needed,to clean. Reinstall the <br /> 20 ft-lbs minimum to 25 ft-lbs maximum. drain valve to its proper position and where <br /> Using OPW DW-VAC-TEST(or 202310 Test applicable, test the valve with CARR procedure TP- <br /> Adaptor), perform a vacuum test on the spill 201.1C or TP-201.1 D. If problems persist, replace <br /> container. An initial vacuum of 15"of water should the drain valve with P/N 1 DK-21 00-EVR(specified <br /> be attained and the spill container must retain a torque 11.5 ft-lbs min to 13.5 ft-lbs max, 5/16-18 UN <br /> vacuum of at least 12"of water after 5 minutes. thread). <br /> (See DW-VAC-TEST Instructions.) Important: Leave these instructions with <br /> 10perator. <br /> Stop 10: (See Figure 2) <br /> Install gravel guard at final height as shown in Figure <br /> 2 and tighten band clamp to 30 in-lbs. Where Height Adjustment Bolt <br /> applicable, per California SB-989, all metal must be <br /> protected from-direct contact with the elements. <br /> Coat stainless steel band clamp with the following <br /> approved coatings: OPW SLA 100, 3M Undersea[ <br /> 08883 or Polyguard Mastic CA-9. <br /> Step 11: (See Figures 2&5) <br /> Before pouring concrete, place plastic over the cover :A_� Shims <br /> and Mounting Ring protecting them from concrete Cap <br /> splash and tighten the clamp on the gravel guard <br /> mounted on the riser pipe. Double check that the to <br /> unit Is level and at proper grade height. Pour 7Adaptor <br /> concrete per Figure 5. Ramp or dome the concrete <br /> away from the mounting ring. There should be a Figure 4 <br /> minimum of 1"slope to finish grade. Slope I"Down From Top of Mounting Ring <br /> Note:Do not stand on spill container before <br /> concrete sets up. Finish Grade <br /> Remove plastic from cover after concrete has dried. <br /> Remove adjustment system. Re-test the spill <br /> containers for leaks as described in step 9, after the <br /> concrete has set up. <br /> Operation and Maintenance: <br /> After each fuel delivery, the operator must remove <br /> any standing fuel from the container. Fuel can be <br /> removed by actuating the drain valve or with a <br /> gasoline absorbing disposable towel. X.. <br /> )g2gllki <br /> ly, Perform a visual inspection of the interior of Figure 5 <br /> the primary containment bucket for water or other <br /> contaminants and check the secondary containment <br /> OPW 1-3100 Series Spill Container Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.