Laserfiche WebLink
Elena K. Manzo [EH] <br /> From: Angel Rodriguez <angel.r@waltonengineering.com> <br /> Sent: Wednesday, May 16, 2018 9:47 AM <br /> To: Elena K. Manzo [EH] <br /> Cc: Richard Walton; Michael Walton <br /> Subject: RE: Inspection Schedule - SR0079061 - 7-Eleven - Da Vinci Dr. - Stockton <br /> Attachments: Tank Information.pdf;Tank Calibration Chart.pdf; Drop Tube.pdf, Delgado, David .pdf <br /> Importance: High <br /> Good morning Elena, <br /> Please see attached calibration chart and tank information. We would like to add replacing the drop tube to the existing <br /> permit SR0079061. <br /> Please let me know if you need anything else. <br /> Thanks, <br /> Angel Rodriguez <br /> Walton Engineering <br /> 916-373-1165 <br /> From:Angel Rodriguez <br /> Sent: Friday, May 11, 2018 4:53 PM <br /> To: Elena K. Manzo [EH] <emanzo@sjcehd.com> <br /> Cc: Richard Walton<r.walton@waIto nengineering.com>; Michael Walton<M.Walton@waltonengineering.com> <br /> Subject: Inspection Schedule-SR0079061-7-Eleven - Da Vinci Dr. -Stockton <br /> Good afternoon Elena, <br /> Per our phone conversation regarding the inspection schedule next week. I wanted to give you our foreman's phone <br /> number. <br /> Backfill inspection on Wednesday May 16th @ 9:00 AM <br /> Final inspection on Thursday May 17th @ 1:00 PM <br /> Our on-site foreman is David Delgado—916-343-3710 <br /> Address: 4627 Da Vinci Dr. Stockton CA 95207 <br /> Thanks <br /> 1 <br />