My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTING <br /> Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: • Pressure o vacuum o Hydrostatic o Other(see below) <br /> Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br /> Description Line#1 Line#2 <br /> Tank product Gasoline-87 Gasoline-91 <br /> Pipe manufacturer Environ Environ <br /> Pipe material Poly <br /> Primary pipe diameter (inches) 1.5 <br /> Secondary pipe diameter (inches) 1.8 <br /> Method of secondary pipe isolation Termenation Boot <br /> Location of secondary pipe isolation Tank Sump <br /> Estimated length of piping run (feet) 100 <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize (hr:min) 0:05 <br /> Test start time 2:23 PM <br /> Initial pressure (psig) 5.0 <br /> Test end time 1:23 PM <br /> Final pressure(psig) 5.0 <br /> Test duration (hr:min) 1:00 <br /> Change in pressure (psig) 0.0 <br /> Pass/Fail threshold (psig) 0.5 <br /> TEST RESULT PASS <br /> Comments: <br /> 0 2006 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.