Laserfiche WebLink
Scope of Work: <br />Remove and replace the existing RUL and PUL direct - <br />bury spill containers <br />• Sawcut, remove and dispose of the concrete at each of <br />two (2) spill containers. <br />• Remove and dispose of the existing spill containers. <br />• Install all Source NA furnished OPW spill containers, <br />swivel adapters, caps, face seal adapters and jack screw <br />kits. <br />• Obtain the required CUPA inspection prior to backfill. <br />• Backfill and restore all concrete removed for this work. <br />• Obtain all CUPA inspections and provide all CUPA and <br />Air Quality testing. <br />Open Parking Lot <br />!k <br />Legend <br />G Gasoline - 87 <br />• Gasoline - 89 <br />• Gasoline - 91 <br />ODiesel <br />• Vapor <br />O Annular <br />• Submersible Turbine Pump <br />0 TLM Probe <br />Monitoring System Panel <br />B Emergency Shut -Off Switch <br />Q Overfill Alarm <br />8 Float & Chain <br />O Sump/UDC Sensor <br />♦.. Interstitial Sensor <br />Vacuum Sensor <br />O Line Leak Detector <br />ISD Flow Meter <br />ISD Pressure Sensor <br />oo Spill Containment Kit <br />c <br />o_ <br />y a <br />fOf m <br />c0 <br />m m <br />() <br />O <br />I- <br />- <br />0 <br />Z <br />L � <br />00 <br />N � <br />C3 <br />C N <br />jLJO <br />Q <br />> M <br />N (0 <br />C Q <br />W <br />_ U <br />> c <br />N <br />~ <br />� <br />N O <br />V /) <br />