My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:27:36 AM
Creation date
6/23/2020 6:41:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />TANK ANNULAR TESTING <br />Test Method By: • Manufacturer O Industry Standard O Professional Engr. O Other (see below) <br />Test Method Uses: O Pressure • Vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Vacuum Gauge (range 0 to 30 inches Hg) <br />Decr_rintinn Tank #1 Tank #2 <br />Product stored <br />87 <br />91 <br />Tank manufacturer <br />2:00 PM <br />1:15 PM <br />Tank material <br />20.0 <br />12.0 <br />Tank capacity (US gallons) <br />10,000 <br />10,000 <br />Is this a multi -compartment tank? <br />20.0 <br />12.0 <br />Dry or Brine filled annular? <br />DRY <br />DRY <br />Monitoring system show normal annular? <br />0.0 <br />0.0 <br />Is water table above tank bottom? <br />2.0 <br />2.0 <br />Was sensor removed for testing? <br />NO <br />NO <br />Was sensor properly replaced after testing? <br />YES <br />YES <br />Wait time for vacuum to stabilize (hr:min) <br />:15 <br />:15 <br />Test start time <br />2:00 PM <br />1:15 PM <br />Initial vacuum (inches Hg) <br />20.0 <br />12.0 <br />Test end time <br />3:00 PM <br />2:15 PM <br />Final vacuum (inches Hg) <br />20.0 <br />12.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />Change in vacuum (inches Hg) <br />0.0 <br />0.0 <br />Pass/Fail threshold (inches Hg / hour) <br />2.0 <br />2.0 <br />TEST RESULT <br />PASS <br />PASS <br />Comments: <br />0 2017 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.