My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_1986-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2023 2:04:46 PM
Creation date
6/23/2020 6:41:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1999
RECORD_ID
PR0231083
PE
2361
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231083_2057 S EL DORADO_1986-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 'f <br /> z <br /> zz <br /> WRI= MONITORING OC <br /> UNDERGROUND STORAGE TANI- ja� OGRA}.�r1 <br /> ThMoluatinR <br /> This monitoring program must be kept at the UST location at all times. on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division,phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unim required to obtain approval before maldng the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name - <br /> Facility Address / C - q5"W6 <br /> A. Describe the frequency of perfo . g the monitoring: <br /> Tank uc�,,- T CKs 4- <br /> Piping i�.scv-t3 Z>9., , <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank �K a- ' <br /> Pipings <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached <br /> -�� -� .A <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or Maintaining the a uipment: <br /> E. Reporting format for monitoring: <br /> Tank `31 tw h n c <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: <br /> G. Describe the training necessary for the operation of UST system, including pi trig, <br /> and the monitoring equipment: <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.