11 <br />All tanks must be measured to determine vertical deflection. Follow deflectioiHneasurement instructions in the Installation Manual. An initial deflection <br />measurement is taken and recorded as a point of reference. Subsequent measurements show tank deflection and can be compared to the Table below. Take <br />each measurement from the same fitting using the same procedure. <br />ridn 11ridMP II <br />TANK <br />XERXES& *TANK INSTALLATION CH&LIST <br />CORPORATION <br />Fiberglass Underground Storage Tanks <br />DIAMETER <br />Single -Wall (SWT), Double -Wall (DWT), Multicompartment (MCT) and OilMater Separators (OWS) <br />6 <br />8 <br />10 <br />12 <br />Complete this checklist, and keep it with copies of any written authorizations for variations and/or deviations received from Xerxes. <br />• <br />Date of Installation Tank Size and Capacity <br />• <br />Tank Type SWT DINT MONITORING -FLUID DRY MCT OWS (Circle those that apply.) UL Number <br />• <br />Site Owner <br />• <br />Site Address <br />1/2 <br />314 <br />STREET CITY STATE ZIP <br />1-1/2 <br />• <br />Installing Contractor <br />• <br />CONTRACTOR NAME STREET CITY STATE ZIP <br />On -Site Supervisor <br />Verified by: <br />A. <br />Visual Inspection: No evidence of damage (holes, cracks, gouges) in tank. (Document any damage found.) <br />B. <br />Monitoring -Fluid Tanks: 1. Check and record monitoring -fluid level in reservoir. - - <br />2. Check for monitoring fluid inside and outside of tank. . . . . . . . . . . . . . . . . <br />C. <br />Physical Test Preinstallation air/soap test completed in accordance with installation instructions . . . . . . . . . . . <br />D. <br />Backfill Material: (Indicate which type.) 1. Pea gravel or crushed stone as specified by XERXES . . . . . . . . . <br />2. Other (Requires specific approval by XERXES — describe.) . . . . <br />E. <br />Excavation: Hole dimensions are correct per installation instructions for appropriate conditions. . . . . . . . . . . <br />F. <br />Internal Measurement. The inside diameter of the tank has been measured and documented (Dimension "A" below). . <br />G. <br />Geotextile Utilized: (indicate one.) 1. Yes 2. No . . . . . . . . . . . . . . . . . . . . . . . <br />H. <br />Hole Condition: (indicate one.) 1. Dry hole (Water is not anticipated to reach tank — area is not subject to flooding.). <br />2. Wet hole (Excavation may trap water— area is subject to flooding.). .. . . . . . . . <br />I. <br />Traffic Loads: (indicate one.) 1. Traffic loads anticipated . . . . . . . . . . . . . . . . . . . . . . . . <br />2. No traffic loads anticipated . . . . . . . . . <br />J. <br />Anchodng: Performed in accordance with installation instructions. 1. Deadmen 2. Full slab . . . . . <br />K. <br />Fittings and Other Metal Components: Coated to protect against corrosion. . . . . . . . . . . . . <br />Verified by: <br />A. <br />Backfill -material bed is level and is a minimum of 12 inches deep, over native soil or slab, before setting tank. <br />B. <br />Tank Spacing: Tanks are spaced correctly from each other and from excavation according to instructions. <br />C. <br />Visual Inspection: No evidence of damage is found after setting in hole . . . . . . . . . . . . . . . . <br />D. <br />Hold-down Straps: Positioned and secured according to installation instructions. (See SECTION 64 of Installation Manual.), <br />E. <br />Backfill compacted: Material has been tamped and/or compacted to fill all voids around tank. . . . . . . . <br />F. <br />Tank is properly ballasted during backfi(ling: (wet -hole installation only) . . . . . . . . . . <br />G. <br />Tank(s) are buried at proper depth to conform to appropriate conditions: (wet, dry, traffic or no traffic) . . . . . . . . <br />M-76milklon., 11 Mine I Verified by: <br />A. <br />Physical Test Air/soap test is completed according to installation instructions. <br />B. <br />Internal Measurement: The inside diameter of the tank has been measured and documented (Dimension "B" below). <br />C. <br />Monitoring -Fluid Tanks: 1. Check and record monitoring -fluid level in the reservoir — (inches) .. . . . . . . . . <br />2. Check for monitoring fluid inside tank.. . . . . . . . . . . . . . . . . . . . . . . <br />D. <br />Installation Manual: Deliver Installation Manual and Operating Guidelines to owner.. . . . . . . . . . . . . . . . . <br />11 <br />All tanks must be measured to determine vertical deflection. Follow deflectioiHneasurement instructions in the Installation Manual. An initial deflection <br />measurement is taken and recorded as a point of reference. Subsequent measurements show tank deflection and can be compared to the Table below. Take <br />each measurement from the same fitting using the same procedure. <br />ridn 11ridMP II <br />TANK <br />DIAMETER <br />4 <br />6 <br />8 <br />10 <br />12 <br />(Feet) <br />ALLOWABLE <br />DEFLECTION <br />1/2 <br />314 <br />1-1/4 <br />1-1/2 <br />1-314 <br />(inches) <br />MEASUREMENTS <br />Internal Diameter before backfilling W <br />Internal Diameter after backfilling 'B" <br />1 2 3 4 T. ff <br />DEFLECTIONS W minus 'B" 5 6 <br />Verified by: Mark the location where deflection <br />measurements were taken. <br />26 <br />