My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_1999-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 5:05:11 PM
Creation date
6/23/2020 6:41:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2001
RECORD_ID
PR0231083
PE
2361
FACILITY_ID
FA0003735
FACILITY_NAME
QUICK N EASY MART
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
01
SITE_LOCATION
2057 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231083_2057 S EL DORADO_1999-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />MANUAL PRESSURE RELIEF: <br />A standard FE Petro <br />feature. When <br />necessary during <br />maintenance to blee <br />line pressure to zero <br />vent screw is provid, <br />By turning this scree <br />product is diverted <br />back to the tank, <br />dropping line <br />pressure to zero. <br />{ <br />N <br />heYsump <br />R` �er�icirl�> <br />ftr <br />nigans,d the <br />If ever required, the <br />pump can be easily <br />removed from the <br />tank by unthreading <br />three bolts. There is <br />no need to disconnect <br />the syphon system, or <br />remove the leak <br />detector from the <br />system to service <br />the STP. <br />m i4�rrovtins one <br />VERTICAL DISCHARGE: <br />Another unique feature of FE Petro. Provides for <br />a simple connection to underground piping. <br />ISO 9001 CERTIFIED: <br />FE tre,9 quality commitment to supply you <br />aw it d class product in accordance with <br />In atonally, recognized quality standards. <br />The FF Petro optional single phase motor control box <br />is availahle in two configurations. These control <br />boxes are 111,1isled, CSA Certified or CU L listed and <br />fit any horsepower FE Petro 4" suhmersihie. Models <br />are available in both 120 volt and 220 volt coils for 50 <br />and 60 IN power supplies. Please specify. <br />� <br />STP -CRS: Control Box with wiring <br />terminals, contactor relay <br />and pilot light with lock <br />out toggle switch. One <br />required per purnp. SW <br />VEnclosure <br />size is <br />8 11/2" x 5 x 2 7/R" <br />(216mm x .148rnm x 73mrn). <br />STP-CBR4: Our 4 <br />pump motor <br />controller has relays <br />for 4 submersibles, <br />plus voltage surge <br />arrestors to arrest <br />power surges over <br />500 volts. Enclosure size is 14" x ll" x 5" <br />(356tnm x 279mm x 127mm). <br />IFS:Ourintake" <br />filter screen+' r <br />option utilizes <br />316 stainless <br />steel to filter <br />particles t" <br />,009" (.23tnm) and larger. It, can significantly <br />reduce dispenser filter changes, reducing <br />maintenance costs by 100's of dollars per year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.