Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING V f CM5 <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑P L <br /> ❑Other(Spec) Hr:AlTw rr A0Te 'T <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> IP <br /> iping Material: Fiberglass Fiberglass <br /> ipingg Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 110' Approx.90' <br /> Product Stored: Super 91 Regular 87 <br /> Method and location of Test boot at Test boot at <br /> piping-run isolation: STP Piping Sump#1 STP Piping Sump 42 <br /> Wait time between applying 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:20 9:15 <br /> Initial Reading(RI): 3 Psi 3 Psi <br /> Test End Time: 10:20 10:15 <br /> Final Reading(RF-): 3 Psi 3 Psi <br /> Test Duration: 1 Hour I Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass' <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />