Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Pian <br />Site Address: Quick N Stop Mart — 2057 S EI Dorado Stockton CA <br />11 <br />C.� <br />.................................................................. <br />.................................................................. <br />.................................................. KEY ....... <br />. . . . . . . . . . . . . <br />. . . . . . . . <br />. . . . . . . . . <br />. . . . . . . . . <br />A=ANNULAR <br />F=FILLS <br />T=TURBINE <br />. . . . . . . <br />. . . . . . . <br />FCA <br />P --PROBE <br />. . . . . . . . . . <br />. . . . . . . . . . <br />V=VAPOR <br />. . . . . . . <br />. .. . . . . . . . . . . . <br />. . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . <br />. . . . . . . . . . X=SENSOR . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . <br />Date map was drawn: 4-1-13. <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). in the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />