Laserfiche WebLink
copy of the alarm history report or log, along with documentation describing <br />action taken in response to any alarm(s), shall be attached to the monthly visual <br />inspection record. <br />(2) Inspecting for the presence of hazardous substance, water, or debris in spill <br />containers. <br />(3) Inspecting for the presence of hazardous substance, water, or debris in under - <br />dispenser containment areas, and checking that the monitoring equipment in these <br />areas is located in the proper position to detect a leak at the earliest possible <br />opportunity. <br />(4) Inspecting for the presence of hazardous substance, water, or debris in <br />containment sumps that, in the past month, have had an alarm for which there is <br />no record of a service visit, and checking that the monitoring equipment in these <br />containment sumps is located in the proper position to detect a leak at the earliest <br />possible opportunity. <br />(5) Checking that all required testing and maintenance for the underground storage <br />tank system have been completed, and documenting the dates these activities <br />occurred. <br />(6) Verifying that all facility employees have been trained in accordance with <br />subdivision 2715(f). <br />(d) The designated UST operator(s) shall provide the owner or operator with a copy of <br />each monthly inspection report, and alert the owner or operator of any condition <br />discovered during the monthly visual inspection that may require follow-up actions. <br />(e) The owner or operator shall maintain a copy of the monthly inspection record and all <br />attachments for the previous twelve months. The records shall be maintained on-site <br />or, if approved by the local agency, off-site at a readily available location. <br />4 This facility did not have an ICC certified designated operator for approximately <br />two months at the time of the November 15, 2007, routine UST inspection. A new <br />ICC certified designated operator was hired a few days later. <br />4 Monthly designated operator inspection reports for June and October 2007 were <br />not found on site during the November 15, 2007, routine UST inspection. <br />V. ATTACHMENTS <br />Attachment 1 <br />— February 22, 2006, reminder letter to facility to schedule annual <br />monitoring system certification and secondary containment testing <br />Attachment 2 <br />— March 21, 2006, secondary containment test report <br />Attachment 3 <br />— October 30, 2006, routine UST inspection report <br />Attachment 4 <br />— October 30, 2006, routine hazardous waste inspection report <br />Attachment 5 <br />— November 9, 2006, monitoring system certification test report <br />Attachment 6 <br />— November 9, 2006, monitoring system certification inspection report <br />Attachment 7 <br />— December 1, 2006, follow up letter to October 30, 2006, routine UST and <br />hazardous waste inspection reports <br />Attachment 8 <br />— November 15, 2007, routine UST inspection report <br />I <br />