Laserfiche WebLink
[ Monitoring System Certification <br />D. Results of Testing/Servicing <br />Software Version Installed: `f .'L Q, ® Z <br />I..U1H SCLC <br />LNG 7UDN8ri <br />6N" 6MRG9. P.R[3a. <br />is the audible alarm operational? <br />ad Yes <br />p No* <br />9 Yes <br />❑ No* <br />Is the visual alarm operational? <br />Yes <br />❑ No* <br />Were all sensors visually inspected, functionally tested; and confirmed operational? <br />VYes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ o* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br />VN/A <br />operational? <br />Yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? 50es; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (Le., no <br />ydN/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />❑ Yes* <br />No <br />Was any monitoring equipment replaced? if yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />&No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all thai apply) <br />❑ Product; ❑ Water. if yes, describe causes in Section E, below. <br />Yes <br />❑ No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes <br />No* <br />I Is all monitoring a ui ment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Z <br />14 / �� s 062 Pte° 4 Aumr �-r �a�� � �4 <br />UT -036 — 214 <br />t, -d t1ZV9-L9C-60Z <br />Page 2 of 4 <br />w"%unidoes org <br />Rev. 01/17108 <br />e6VOI 60 0£ oea <br />