Laserfiche WebLink
OCT -1-2007 08:19A FROM: <br />TO:4683433 P.3/3 <br />& 0 <br />UST Monitoring Site Plan <br />. ............................... <br />.�0 ............................. <br />............................. <br />........... .......... I ............... <br />..I ............ I.................................... <br />..................... ............................... <br />.............. Iq <br />................................... ... .. .......... <br />.... .......... .. ... <br />... ........ ... .. .......... ... .. .......... <br />...: *.,E:],. *..,.,.* *. * * * . . .......... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />..................................................... <br />Date map was drawn or revised: <br /><4/-z /04 <br />Instructions <br />If you already have a diagram (e.g. your Hazardous Materials Business Plan Site Plan/Storage Map) which <br />shows all required information, you may include it, rather than this page, with this monitoring plan. On your <br />site plan, show the general layout of tanks and piping in relation to nearby buildings or other structures. Clearly <br />identify locations of the following equipment, if installed: monitoring system control panels; mechanical or <br />electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under -dispenser <br />containment, or other secondary containment areas; and, if ATG is required, in -tank liquid level probes. In the <br />space provided, note the date the drawing was prepared. <br />UN -022A - S/S www.unidots org Rev. 10!14/03 <br />