Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Piping Material: <br />Fiberglass Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith Smith <br />Smith <br />Piping Diameter: <br />3" 3" <br />3" <br />Length of Piping Run: <br />Approx. 140' Approx. 150' <br />Approx. 160' <br />Product Stored: <br />Super 91 Regular 87 <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP Test boot at STP <br />Piping Sump #1 Piping Sump #2 <br />Test boot at STP <br />Piping Sump #3 <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes 10 Minutes <br />10 Minutes <br />Test Start Time: <br />9:20 9:30 <br />9:40 <br />Initial Reading (R,): <br />3 Psi 3 Psi <br />3 Psi <br />Test End Time: <br />10:20 10:30 <br />10:40 <br />Final Reading (RF): <br />3 Psi 3 Psi <br />3 Psi <br />Test Duration: <br />1 Hour 1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi 0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />