Laserfiche WebLink
SWRCB, January 2002 <br />Developed By; <br />Test Method Used: <br />Test Equipment Used; <br />Material; <br />Mannufactmer: <br />Dram------_ <br />Lengtn'oFPiping Run; <br />Product Stored: <br />Method and location o <br />s,test: <br />Test Start Time; <br />Initial Reading (R): <br />Test End Time: <br />Final Reading (RF): <br />-Test Duration; • <br />Change in Reading (Rr F— <br />PasslFai1-7 —Ir,Tbld od r <br />Page 3 of <br />I SECONDARY PIPE TESTING 71 <br />ping Manufacturer 0 Industry Standard 0 Professional Engineer <br />O Ther (Sped) <br />^pressure p Vacuum O Hydrostatic <br />F-1 0t er (Spec) <br />Equipment Resolution:s- <br />Piping Run # 1-.L. Piping Run # `2w.. ping Run # A1'i Sing Run # <br />If,, 1z..e.o� [t�s5 Fir �ei;S <br />�cc <br />. . LO- t <br />l h�c-�. <br />"10 <br />15A <br />� A e, <br />5 <br />®Zw)z.w A <br />Comments - (Include Information on repairs madeprior to testing, and recommended <br />