Laserfiche WebLink
0 <br />SWRCB, January 2002 is Page of <br />7. UNDER -DISPENSER CONTAINMENT <br />CTASTING <br />Test Method Developed By: <br />❑ UDC Manufacturer ❑ Industry Standard rofessional Engineer <br />❑ Other (spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />ydrostatic <br />❑ Other (spec) <br />Test Equipment Us <br />i Lee -�v <br />Equipment Resolution: o,11 <br />UDC# <br />UDC#3 <br />IJUDC# VDC# <br />UDC Manufacturer: <br />es . Vy �S Wes.n <br />UDC Material: <br />! , �. <br />r <br />UDC Depth: <br />l0 211 <br />'IL <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />/ <br />e 1 i <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />t <br />Condition of UDC prior to <br />testin <br />Dvy <br />_Pj/ <br />Portion of UDC Tested <br />,¢�:s. 7111 <br />jZ1t <br />Does turbine shut down when <br />UDC sensor detects liquid (bothYes <br />❑ No ❑ NA <br />❑ No ❑ NA <br />❑ Yes ❑ o ❑ NA ❑ Yes ❑ N ❑ NA <br />roduct and water)?* <br />/k/Yes <br />Turbine shutdown response time <br />5ee—, <br />Is system programmed for fail- <br />safe shutdown?` <br />es ❑ No ❑ NA <br />R"Yes ❑ No ❑ NA <br />❑ Yes No ❑ NA ❑ Yes o ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />es ❑ No ❑ NA <br />Pyes ❑ No ❑ NA <br />❑ Yes No 0 NA ❑ Yes No ❑ NA <br />Wait time betwee ing <br />pressure/vacu wat d <br />startin <br />Test Start Time: <br />1. Initial Readin <br />Test End Time: <br />32 ac) <br />3 .' S v <br />Final ReadingRF): <br />X_1 <br />Test Duration: <br />4 <br />Chan e in Readul (RF -RI): <br />1/49 <br />Pass/Fail Threshold or Criteria: <br />00 p W, <br />0 316 <br />Was sensor removed for testing? <br />g <br />.::.ass 0' Pail <br />ass.. D Fail:. <br />Pass:: ❑ ,P'�' .. <br />Was sensor properly replaced and <br />es ❑ No ❑ NA <br />s ❑ No DNA <br />Yes ❑ No ❑ V Yes ❑ No ❑ AA <br />verified functional after testin ? <br />es ❑ No ❑ NA <br />es ❑ No ❑ NA . <br />❑ Yes ❑ No ❑ A ❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made rior to testin , and recommended ollow-u for ailed tests) <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to iy of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />