Laserfiche WebLink
D. Results of Testing/Servicing <br />a <br />Software Version Installed: '-€ ? . C' <br />f nrrrnlete the followin¢ checklist: <br />Xes <br />--- <br />❑ No* Is the audible alarm operational? <br />y- Yes <br />❑ No* Is the visual alarm operational? <br />ft'Yes <br />❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br />C] es <br />❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />Cl Yes <br />❑ * If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />r <br />N/A operational? <br />O'Yes <br />13 No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A monitoring system detects a leak, fails to operate r is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ump/Trench Sensors ispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? El Yes; ❑ No. <br />❑ Yes U No* For tank systems that utilize the monitoring system as the primary tanx overni► warring aevice (i.e. no <br />❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />ElYes* Ll No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />13 Yes* El No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />i'r7. Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />❑ Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />