Laserfiche WebLink
6 <br /> - <br /> SWRCB,January 2002 Page `..' of 'f) <br /> . ®, 5. SECONDARY PEPE TESTING <br /> Fest Method Developed By: 7ping-Manufacturer u Industry Standard u Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: C Pressure Q Vacuum 0 Hydrostatic <br /> C other(spec) <br /> Test.Equipment Used;.. Equipment Resolution: <br /> iF ung Run# Piping Run# Piping Run# Piping Run# <br /> ..:Piping Material: <br /> Piping Manufacturer: — <br /> Piping Diameter: <br /> Length of Piping Run: —_ <br /> Product Stored: <br /> Method and location of <br /> i in -run isolation: <br /> Wait time between applying — <br /> pressure/Vacuum/water and <br /> starting test: <br /> Test Start Time: — <br /> Initial Reading(RI): — <br /> Test End Time: <br /> Final Reading(Rr): — <br /> Test Duration: <br /> Change in Reading(RA,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> :�._..:. .czl?'.'.aSs <br /> Comments—(include in groan n Lepairs made 'or to testing,and recommended follow-u or ailed tests) <br /> £ 'd 2tr£919irsoal sJ®,4aequoa Al a4T13 e££ r01 21 0a A®N <br />