Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br />been addressed for EL DORADO GAS & FOOD MART as of June 29, 2017. <br />Open violations from August 09, 2016 inspection <br />Violation #104 - UST operating permit application for facility and tank information not submitted or current. <br />The Board of Equalization account number TK STF 44045016 is closed and not valid. Immediately contain the <br />Board of Equalization and validate this account. <br />Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br />An inspection was last done on August 12, 2015 and an inspection report was issued identifying information to be <br />submitted to bring this site into compliance. This information was required to be submitted by September 11, 2015. <br />This information has not been received resulting in a non-compliant status for this facility. An operator that receives <br />an inspection report shall have 30 days to submit a written response that includes a statement documenting <br />corrective actions taken or proposing corrective actions which will be taken. Ensure that a written response <br />documenting corrective actions taken or proposed is submitted within 30 days of receiving an inspection report. <br />Outstanding violations from the 2015 monitoring system certification include: The Environmental Health Department <br />did not receive the 2014 Return to Compliance certification for outstanding violations; and an approved copy of the <br />monitoring plans were not available for inspection. The second violation will be removed since a monitoring plan <br />was available today during the inspection. <br />Violation #209 - Designated operator did not inspect all required items and/or the inspection reports not <br />completed. <br />The designated operator listed the date of 9/22/15 for "Spill container structure (bucket) testing was completed <br />within the past year" on the October 26, 2015 through July 27, 2016 designated operator monthly inspection reports. <br />The date that the 91 -product spill container (that initially failed during the annual testing date of 8/12/15) passed was <br />8/31/2015. The designated operator listed "NA" for "Spill container structure (bucket) testing was completed within <br />the past year" on the August 28, 2015 and September 28, 2015 designated operator monthly inspection reports. <br />During the monthly inspection, the designated operator shall check that all required testing and maintenance for the <br />UST system have been completed and document the dates they were done. Ensure that designated operators <br />performing monthly inspections at this facility are including all of the required information on the reports. <br />Page 1 of 1 <br />