Laserfiche WebLink
NEW UST IN=ALLATION INSPECTION RECO <br /> FACILITY NAME: � r ADDRESS: r <br /> SUEEPS$ TANK* ll�® av ULS TANK MCOEL/MATERIAL: F, t <br /> CAPACITY: PRODUCT: R.E.H.S: <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> D S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> ® 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACUUM: SOAP: i:' HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br /> X14 <br /> 4. PRIMARY TANK T T: PSI: 5 HRS/MIN: 3,5 <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFIL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br /> LLL-±3— <br /> � o 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: ® OTHEA: (CCR 2635 (A) (4)) <br /> 8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br /> l w 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> ),;t-3m Y3 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED CCCR 2635 (8)) <br /> FINAL INSPECTION <br /> o �/ 12. PERFORMANCE TEST FOR -ALL- MONITORING PROBES (CCR 2632 (C) (2)) <br /> �/ 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (8) (5)) <br /> 15. PERFORMANCE TEST OF AUTCMATIC PUMP SYSTEM SHAT-OFF CCCR 2635 (8) (5)) <br /> `;? 16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> ar 17. OVERFILL PROTECTION INSTALLEDAPPRCIVED (CCR 2635 (E) (2)) <br /> ® 18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 CD) (5)) <br /> Z _ 19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br /> Y3 el it-V. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> 21. -C- FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br /> ` - - 22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br /> 23. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br /> COMMENTS. <br /> Avg s So a <br /> EH23406 3/92 <br />